Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

9 unique locations (74 components)

Cps House, Stephenson Road, Severalls Industrial Park, Colchester, CO4 9QR (4 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2026-27 (T-4), 2025-26 (T-4) ...
10.63 MW
Grimethorpe CMM Generation Plant Springvale Road Grimethorpe S72 7BF (4 components)

Gas reciprocating engines

Active • 2028-29 (T-4), 2026-27 (T-4) ...
20.80 MW
Land at Hound Farm, Hound Road, Netley, Southampton, SO31 5FS (11 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2027-28 (T-4), 2026-27 (T-4) ...
17.10 MW
Land at Woolaston Road, Park Farm Industrial Estate, Redditch, B987SG (12 components)
• New reciprocating gensets in acoustic enclosure
• Reciprocating genset
Active • 2026-27 (T-4), 2023-24 (T-4) ...
11.08 MW
Land off High View Road, South Normanton, Bolsover, Derbyshire, DE55 2EY (12 components)

Reciprocating genset

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.31 MW
Land off Kibworth Road, Moss Farm, Kibworth Beauchamp, Leicester, LE8 0HJ (6 components)
• 2.5MW gas fired peaking power plant
• 5MW gas fired peaking power plant
• Containerised Reciprocating Gas Engines
Active • 2026-27 (T-4), 2025-26 (T-4) ...
14.38 MW
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (9 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
263.09 MW
No.1 Maxwell Road Woodston Industrial Estate Peterborough PE2 7JB (8 components)
• A power plant, with associated civil works, switchgear and electrical connection.
• A recently completed power plant, with associated civil works, switchgear and electrical connection.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
56.82 MW
Loading map...
Showing 9 locations