Reciprocating engines

4 unique locations (105 components)

Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (21 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.09 MW
Land Adjacent to Stobarts Logistics Off Branthwaite Road Lillyhall Workington Cumbria CA14 4ED (21 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear

Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.23 MW
Kiln Power, Unit 6, Lime Kilns Business Park, Nutts Lane, Hinckley, Leicestershire, LE10 3EL. (40 components)
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. connections and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
119.74 MW
Cavendish Rd Stevenage SG1 2ET UK (23 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.64 MW
Loading map...
Showing 4 locations