Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

134 unique locations (1571 components) - Page 1 of 6

Yew Tree Nursery, Guildford Road, Cranleigh, GU6 8PA (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2026-27 (T-4), 2025-26 (T-4) ...
17.13 MW
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.23 MW
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (20 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• 16 MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
74.02 MW
Whitwell Energy Park Southfield Lane Whitwell Derbyshire S80 3LH (4 components)

Gas reciprocating engines.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
4.10 MW
Wheldale Generation Site Wheldon Road Castleford West Yorkshire WF10 2RT (7 components)

Gas reciprocating engines.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.72 MW
Wellington Street, Oldham, Lancashire OL4 1SA (8 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
18.20 MW
Welkin Road, Bredbury, SK6 2BH (7 components)
• A gas fuelled generating station.
• Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1) ...
21.50 MW
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (16 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
59.11 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (18 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.89 MW
Wallingford Road, Goring, Reading, RG8 0HS (4 components)

A 6.9MW gas fuelled generating station.

Active • 2026-27 (T-4), 2025-26 (T-1) ...
19.47 MW
Unit 7, Cambridgeshire Business Park, Angel Drove, Ely CB7 4DT (5 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.44 MW
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (18 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
• Reciprocating Engine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
58.74 MW
Unit 2, 105 Abercorn Street, Paisley, PA3 4AT (18 components)
• New build gas generator
• Operational reciprocating gas engines
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.06 MW
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (26 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
37.65 MW
Toray 2 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (4 components)
• Gas reciprocating engines
• Gas reciprocating engines.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.05 MW
Titanium Road, Cocket, Swansea, SA5 4NH (7 components)
• New build site with gas reciprocating engines to replace diesel plant
• STOR diesel engines that will operate environmentally with mixed fuel
Active • 2026-27 (T-4), 2025-26 (T-4) ...
18.96 MW
Thurscoe Business Park Barrowfield Rd Thurscoe Rotherham S63 0DB (4 components)

Gas reciprocating engines

Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.28 MW
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (22 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.52 MW
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (20 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
37.65 MW
Tewin Road, Welwyn Garden City, AL7 1BD (1 component)

New build power station comprised of multiple reciprocating engines.

Active • 2026-27 (T-4)
17.13 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (32 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.39 MW
St Asaph Power, Glascoed Road, St Asaph, Denbighshire LL17 0LQ (16 components)
• 16 MW power plant comprising of 8 x 2MW gas fired reciprocating engines.The Power plant is connected to the local distribution and gas network.
• 16 MW power plant comprising of reciprocating engines.The Power plant is connected to the local distribution and gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
59.49 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (20 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
27.92 MW
Shirebrook 2 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (14 components)
• 1 x jenbacher JGS616 GS
• Gas reciprocating engines
• Gas reciprocating engines.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2.36 MW
Shirebrook 1 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (16 components)
• Gas reciprocating engines. (4)
• Gas reciprocating engines
Active • 2028-29 (T-4), 2026-27 (T-4) ...
13.75 MW
Loading map...
Showing 25 locations