Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

226 unique locations (2499 components) - Page 1 of 10

1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (9 components)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
44.72 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (16 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
23 Whittle Road, Ferndale Industrial Estate, Wimborne, BH21 7PW (4 components)

CMU consisting of multiple reciprocating engines and alternators (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
25 Rookwood Way, Haverhill, CB9 8PB (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4)
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (33 components)
• Operational gas reciprocating engine. (2)
• Operational Reciprocating Engine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.64 MW
40 Gardiner Road, Edinburgh, Midlothian, EH4 3RN (1 component)

New build power station comprised of multiple reciprocating engines.

Active • 2025-26 (T-4)
46 Station Road Stokesley Middlesbrough TS9 7AA (12 components)
• Gas CHP engines in commercial horticultural usage with no auxilliary load (2)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.25 MW
4 Chemistry Ln, Pentre, Deeside CH5 2DA, UK (4 components)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
26.16 MW
4 Finway Road Hemel Hempstead HP2 7PT (16 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
62 Marlborough Road Lancing Business Park Lancing BN15 8UF (2 components)

CMU consisting of multiple reciprocating engines and alternators (2)

Active • 2025-26 (T-4), 2022-23 (T-1)
84 Bridge St, Wednesbury WS10 0AN (1 component)

New build power station comprised of multiple reciprocating engines

Active • 2025-26 (T-4)
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (19 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
37.74 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (16 components)

One Jenbacher CHP engine with a generation capacity of 3.36 MW (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.31 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (11 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.63 MW
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (11 components)
• The CMU component is net of the auxiliary power required (2)
• A completed power plant, with associated civil works, switchgear and electrical connection.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
52.31 MW
Belvedere Lane, Milton Keynes, MK17 9JH (2 components)
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 8MW for a 1 hour duration installed on designated …
Active • 2025-26 (T-4)
Bond Avenue Bletchley Milton Keynes MK1 1JJ (19 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.79 MW
Bond Avenue Bletchley Milton Keynes MK1 1JJ (18 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.88 MW
Bones lane, Cheddleton, Leek, Staffordshire, ST13 7BT (7 components)

1.9 MW Gas gen ENER-G 1999 (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 25 locations