Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

18 unique locations (846 components)

Power Station Road Isle of Grain Rochester ME3 0AR (69 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2886.91 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (55 components)
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 41 - CCGT MSID: 7237
• Pembroke 51 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6359.67 MW
New Galloway, Castle Douglas, Kirkcudbrightshire, DG7 3SF, Scotland (43 components)
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
78.70 MW
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (45 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2527.80 MW
Langstone Power Generation Plant, Southmoor Lane, Havant, Hampshire, PO9 1JW (10 components)
• Grain B CCGT Unit 6 CHP element is via supply of heat to Grain LNG regasification facility
• Municipal waste incineration plant located in Chineham Hampshire. It is based on one boiler supplying steam to a turbine-generator.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
19.05 MW
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (18 components)
• Battery Storage Plant
• Small gas fired OCGT.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
98.37 MW
Land on the east side of Cowpen Bewley Road, Billingham,  TS23 4ED (26 components)
• Gas peaking reciprocating engine
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
• Reciprocating genset
Active • 2028-29 (T-4), 2027-28 (T-4) ...
236.69 MW
Land at Oaklands Farm Featherstone Lane, Wolverhampton, Staffordshire, WV10 7JZ (4 components)
• Enfield CCGT Power Station - (one unit station)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2025-26 (T-4) ...
29.43 MW
EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU (34 components)
• Torness Power Station CMU 1: [TN1-23] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 1: [TN1-24] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 2: [TN2-24] T_TORN-2 + (50% x T_TORN-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3068.68 MW
EDF Energy, Sizewell B power station, Nr Leiston, Suffolk, IP16 4UR (39 components)
• Sizewell B Power Station CMU 1: [SZ1-24] T_SIZB-1 + (50% x T_SIZB-D)
• Sizewell B Power Station CMU 2: [SZ2-23] T_SIZB-2 + (50% x T_SIZB-D)
• Sizewell B Power Station CMU 2: [SZ2-24] T_SIZB-2 + (50% x T_SIZB-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4640.16 MW
EDF Energy, Hartlepool power station, Tees Road, Hartlepool, TS25 2BZ (57 components)
• Hartlepool Power Station CMU 2: [HR2-23] T_HRTL-2
• Hartlepool Power Station CMU 2: [HR2-24] T_HRTL-2
• Hartlepool Power Station CMU 1: [HR1-24] T_HRTL-1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5859.76 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
Cwm Rheidol Aberystywth, Ceredigion SY23 3NF Aberystwyth (34 components)
• An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will consist of the delivery of waste to the Facility by truck where it will be deposited in a storage bunker, from which it will be fed into two thermal units. Each unit will consist of a moving grate, boiler and air pollution control equipment. The steam generated will drive a turbine for the generation of electricity.
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Cwm Rheidol Power Station (being one out of two) which is supplied by water from the Dinas Reservoir.
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Dinas Power Station, which is supplied by water from the Nant-y-Moch reservoir.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
151.50 MW
Component has yet to be procurred (226 components)
• Component has yet to be procurred
• District heating implementation with one asset 1MW and no auxiliary load
• Poole Existing Site CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1238.88 MW
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (35 components)
• A 7.5MW Tesla Battery Energy Storage System
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2098.53 MW
Challenge Way, Blackburn, Lancashire BB1 5QB (2 components)
• Connah's Quay PS Unit 4 CCGT
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2025-26 (T-4), 2022-23 (T-3)
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (46 components)
• Hamms Hall - Existing Site CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
179.28 MW
ACS&T - Wolverhampton - Site 2, ACS&T Logistics, Park Lane , Wolverhampton, WV10 9QD (30 components)
• Gas fired reciprocating engines.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
43.30 MW
Loading map...
Showing 18 locations