Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

2 unique locations (17 components)

Tuesley Farm, Tuesley Lane, Godalming, Surrey GU7 1UG (10 components)
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• Water Source Heat Pumps at 1748KW each (x2)
• Water source heat pumps at 1748kW each
Active • 2028-29 (T-4), 2025-26 (T-4) ...
76.97 MW
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (7 components)
• CMU ID 22GER1, a new build battery storage CMU
• CMU consisting of multiple reciprocating engines and alternators
• Existing generating storage battery asset with CMU ID 24GER1
Active • 2025-26 (T-1), 2023-24 (T-4) ...
26.23 MW
Loading map...
Showing 2 locations