Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

11 unique locations (540 components)

THE PADDOCKS BROADWAY ROAD CHARLTON ADAM SOMERTON TA11 (2 components)
• Processing station located in London and aggregates meter data from sites across the UK
• Reciprocating engine (natural gas fuelled)
Active • 2025-26 (T-1), 2018-19 (T-4)
47.99 MW
SG18 (99 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
234.49 MW
S5 (28 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
93.99 MW
S36 (87 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
160.71 MW
OX3 (62 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
82.50 MW
HP10 (75 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
47.47 MW
FARRIERS WAY EAST GOSCOTE LEICESTER LE7 (2 components)
• Ince, Wigan, WN2 2EG. Auxiliary load subtracted prior to the metering point.
• Reciprocating engine (natural gas fuelled)
Active • 2025-26 (T-1), 2018-19 (T-4)
8.83 MW
EH25 (20 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2024-25 (T-1) ...
54.02 MW
CM16 (51 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
52.03 MW
CF5 (101 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
173.32 MW
3 Nairn Road, Deans Industrial Estate, Livingston, West Lothian, EH54 8AY (13 components)
• Newbuild gas generator
• Reciprocating engine (natural gas fuelled)
Active • 2026-27 (T-4), 2025-26 (T-1) ...
40.95 MW
Loading map...
Showing 11 locations