Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

10 unique locations (246 components)

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (66 components)
โ€ข A gas engine CHP site providing electricity & heat to the associated development
โ€ข A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
โ€ข Load reduction on site supported by non-exporting standby generation.
Active โ€ข 2025-26 (T-4), 2024-25 (T-4) ...
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (20 components)
โ€ข 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
โ€ข 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
โ€ข Ratcliffe Unit 3 coal-fired unit
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
61.51 MW
Marchwood Power, Marchwood Industrial Park, Oceanic Way, Marchwood, Southampton, SO40 4BD (22 components)
โ€ข 8.3MW Gas Turbine installation
โ€ข Existing CCGT unit
โ€ข Marchwood CCGT
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
3678.80 MW
Eurac - Dorset, 16 Mannings Heath Road Poole Dorset BH12 4NJ (42 components)
โ€ข 10.000MW DSR
โ€ข A gas fuelled generating station.
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
21.66 MW
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (10 components)
โ€ข 0.250MW Battery Energy Storage System
โ€ข 10 x 2MW gas generator units to be installed on designated land within Southbrook Farm
โ€ข 5MW of demand reduction
Active โ€ข 2024-25 (T-4), 2023-24 (T-4) ...
Ashford Rd, Charing TN27 0DF, United Kingdom (10 components)
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข N/A
โ€ข New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active โ€ข 2024-25 (T-4), 2023-24 (T-4) ...
3.45 MW
Ardagh Group - Barnsely Site 2, Burton Road, Monk Bretton South Yorkshire S71 5RP (18 components)
โ€ข 3.6MW of demand reduction
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข Load reduction on site supported by non-exporting standby generation.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
11.11 MW
ACS&T - Wolverhampton - Site 2, ACS&T Logistics, Park Lane ,ย Wolverhampton, WV10 9QD (30 components)
โ€ข Gas fired reciprocating engines.
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 MW.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
43.30 MW
ABP Ellesmere, The Abattoir, Hordley, Ellesmere SY12 9BL, United Kingdom (17 components)
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข ROCable hydro units within the BMU are not included in the CMU.
โ€ข Turbomach M50 Natural Gas fired CHP unit
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
77.42 MW
4 Finway Road Hemel Hempstead HP2 7PT (11 components)
โ€ข 14.710 MW CHP generation
โ€ข Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
โ€ข Onsite load reduction and back up generation behind the meter on multiple sites
Active โ€ข 2024-25 (T-4), 2022-23 (T-3) ...
4.76 MW
Loading map...
Showing 10 locations