10 unique locations (247 components)

4 Finway Road Hemel Hempstead HP2 7PT (11 components)
โ€ข 14.710 MW CHP generation
โ€ข Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
โ€ข Onsite load reduction and back up generation behind the meter on multiple sites
Active โ€ข 2024-25 (T-4), 2022-23 (T-3) ...
4.76 MW
ABP Ellesmere, The Abattoir, Hordley, Ellesmere SY12 9BL, United Kingdom (17 components)
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข ROCable hydro units within the BMU are not included in the CMU.
โ€ข Turbomach M50 Natural Gas fired CHP unit
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
77.42 MW
ACS&T - Wolverhampton - Site 2, ACS&T Logistics, Park Lane ,ย Wolverhampton, WV10 9QD (30 components)
โ€ข Gas fired reciprocating engines.
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 MW.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
43.30 MW
Ardagh Group - Barnsely Site 2, Burton Road, Monk Bretton South Yorkshire S71 5RP (18 components)
โ€ข 3.6MW of demand reduction
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข Load reduction on site supported by non-exporting standby generation.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
11.11 MW
Ashford Rd, Charing TN27 0DF, United Kingdom (10 components)
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข N/A
โ€ข New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active โ€ข 2024-25 (T-4), 2023-24 (T-4) ...
3.45 MW
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (10 components)
โ€ข 0.250MW Battery Energy Storage System
โ€ข 10 x 2MW gas generator units to be installed on designated land within Southbrook Farm
โ€ข 5MW of demand reduction
Active โ€ข 2024-25 (T-4), 2023-24 (T-4) ...
Eurac - Dorset, 16 Mannings Heath Road Poole Dorset BH12 4NJ (42 components)
โ€ข 10.000MW DSR
โ€ข A gas fuelled generating station.
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
21.66 MW
Marchwood Power, Marchwood Industrial Park, Oceanic Way, Marchwood, Southampton, SO40 4BD (22 components)
โ€ข 8.3MW Gas Turbine installation
โ€ข Existing CCGT unit
โ€ข Marchwood CCGT
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
3678.80 MW
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (20 components)
โ€ข 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
โ€ข 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
โ€ข Ratcliffe Unit 3 coal-fired unit
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
61.51 MW
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (67 components)
โ€ข A gas engine CHP site providing electricity & heat to the associated development
โ€ข A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
โ€ข Load reduction on site supported by non-exporting standby generation.
Active โ€ข 2025-26 (T-4), 2024-25 (T-4) ...