Reciprocating engines

13 unique locations (463 components)

Vacant land, Portsdown Technology Park, Southwick Rd, Portsmouth, Hampshire, PO6 3RU (5 components)
• 20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Shirebrook 2 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (9 components)
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage)
• Gas reciprocating engines.
• Natural Gas fired CHP unit at Halton General Hospital, Hospital Way, Runcorn, Cheshire WA7 2DA
Active • 2028-29 (T-4), 2024-25 (T-4) ...
1.18 MW
Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (49 components)
• 1 x hydro turbine & synchronous generator
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
207.87 MW
Poole Bank Nurseries , Common Lane, Welton, Hull, HU15 1UT (18 components)
• Aggregate CMU from multiple sources
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2024-25 (T-4) ...
287.90 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (10 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
31.39 MW
Land at Fulwood Rd North, Sutton-in-Ashfield, NG17 2NB (30 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Battery storage unit
• New reciprocating gensets in acoustic enclosure
Active • 2025-26 (T-4), 2024-25 (T-4) ...
10.42 MW
Land at Exmoor Windows Brunel Way Minehead TA24 5BY (9 components)
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2024-25 (T-4), 2023-24 (T-1) ...
27.42 MW
Ffestiniog Power Station, Tanygrisiau, Blaenau Ffestiniog, LL41 3TP (48 components)
• 1hr duration battery storage project.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
476.10 MW
Excalibur Road, Beacons Park, Gorleston, Great Yarmouth, Norfolk NR31 7RQ (20 components)
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage)
• New build power station comprised of multiple reciprocating engines.
• Unit 4 Cruachan pump storage hydro plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
5.71 MW
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
252.48 MW
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (42 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• On-site existing CHP generating unit
Active • 2027-28 (T-4), 2024-25 (T-4) ...
Asda Scunthorpe, Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (9 components)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on flexible electricity consuming processes
Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.73 MW
2 Bar Lane, York, YO51 9LS (60 components)
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• New build gas generator
Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.41 MW