Reciprocating engines

19 unique locations (530 components)

XPO - Logistics Bedworth, St. Davids Way, Bermuda Park, Nuneaton, Warwickshire CV10 7SD  (20 components)
• CHP Unit
• CHP engine in a horticultural environment, natural gas, no aux load
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
17.61 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (24 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.354 MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.85 MW
Toray 3 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (2 components)
• Gas reciprocating engines
• Water treatment centre
Active • 2024-25 (T-1), 2021-22 (T-4)
1.04 MW
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (20 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build windfarm.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
41.74 MW
Stoneykirk Road, Stranraer, DG9 7BU (23 components)
• CHP unit
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• Gas fired CHP unit
Active • 2024-25 (T-4), 2024-25 (T-1) ...
12.50 MW
Runnings Road, Swindon Village, Cheltenham, GL51 9NQ (12 components)
• A gas engine CHP site providing steam and electricity to an industrial unit
• An Exiting diesel grid support plant
• CHP plant
Active • 2024-25 (T-1), 2023-24 (T-4) ...
6.31 MW
Pye Bridge Industrial Estate, Somercotes, Alfreton, DE55 4NX (15 components)
• Additional reciprocating gas engines running on natural gas returned to service
• Reciprocating gas engines running on natural gas
• Water treatment centre
Active • 2026-27 (T-4), 2024-25 (T-1) ...
25.06 MW
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (27 components)
• A gas fuelled generating station.
• Generators at hospital site
• Peterhead CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6471.35 MW
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (20 components)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• Ratcliffe Unit 3 coal-fired unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
61.51 MW
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (7 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Battery Project on Greenfield Site
• New Build transmission connected Battery Storage site on land Adjacent to National Grid's Rainhill Substation
Active • 2028-29 (T-4), 2024-25 (T-1) ...
48.57 MW
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (18 components)
• Battery Storage Plant
• Small gas fired OCGT.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
98.37 MW
Land lying to the north west of Staithes Road, Hull, HU12 8DX (12 components)
• 21 MW power plant comprising 11 gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 21MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Gas fired CHP unit
Active • 2028-29 (T-4), 2025-26 (T-4) ...
41.44 MW
Land at Seal Sands Road, Seal Sands, Middlesbrough, TS2 1UB (11 components)
• Gas fired CHP unit
• New build power station comprised of multiple reciprocating engines.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
1.83 MW
Hams Hall Sustainable Energy LTD, Edison Road, Hams Hall Distribution Park, Coleshill, B46 1AL (18 components)
• Battery Storage Plant
• Hamms Hall - Existing Site CHP
• Poole Existing Site CHP
Active • 2028-29 (T-4), 2026-27 (T-4) ...
18.43 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2472.54 MW
EDF Energy, Hunterston B power station, West Kilbride, Ayrshire, KA23 9QX (40 components)
• Existing CCGT Unit
• Hunterston B Power Station CMU 7: [HU7-21] T_HUNB-7 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
• Hunterston B Power Station CMU 8: [HU8-21] T_HUNB-8 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1607.21 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
Cwm Rheidol Aberystywth, Ceredigion SY23 3NF Aberystwyth (34 components)
• An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will consist of the delivery of waste to the Facility by truck where it will be deposited in a storage bunker, from which it will be fed into two thermal units. Each unit will consist of a moving grate, boiler and air pollution control equipment. The steam generated will drive a turbine for the generation of electricity.
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Cwm Rheidol Power Station (being one out of two) which is supplied by water from the Dinas Reservoir.
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Dinas Power Station, which is supplied by water from the Nant-y-Moch reservoir.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
151.50 MW
Connect House, Bates Road, Quayside Industrial Estate, Maldon, Essex, CM9 5FA (12 components)
• 14MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• gas fired reciprocating engines
Active • 2024-25 (T-1), 2023-24 (T-4) ...
19.60 MW
Loading map...
Showing 19 locations