Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

68 unique locations (768 components) - Page 1 of 3

Wheldale Generation Site Wheldon Road Castleford West Yorkshire WF10 2RT (7 components)

Gas reciprocating engines.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.72 MW
Wellington Street, Oldham, Lancashire OL4 1SA (8 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
18.20 MW
Wallingford Road, Goring, Reading, RG8 0HS (4 components)

A 6.9MW gas fuelled generating station.

Active • 2026-27 (T-4), 2025-26 (T-1) ...
19.47 MW
Tweedale Way, Oldham OL9 8EH (8 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2024-25 (T-1) ...
8.68 MW
Toray 3 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (2 components)

Gas reciprocating engines

Active • 2025-26 (T-4), 2024-25 (T-1)
Toray 2 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (4 components)
• Gas reciprocating engines
• Gas reciprocating engines.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.05 MW
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (7 components)
• Gas fired generating unit
• Gas generating unit(s)
• Gas reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Tickhill Road Rotherham South Yorkshire S66 7QW (2 components)

Gas reciprocating engines

Active • 2025-26 (T-4), 2024-25 (T-1)
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A Battery Energy Storage System
• A gas fuelled generating station
Active • 2025-26 (T-4), 2024-25 (T-1)
Scawby Brook, Scawby, Brigg, DN20 9LT. (3 components)

Brigg Gas Peaker

Active • 2026-27 (T-4), 2025-26 (T-1) ...
90.56 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (10 components)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.95 MW
Rhodesia Power Limited, Highgrounds Industrial Estate Highgrounds road, Rhodesia, Worksop, S80 3AT (4 components)

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial …

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.87 MW
Rectory Field, Cards Road, Sandon, CM2 7AE (8 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
38.38 MW
Radstone Rd, Radstone, Brackley NN13 5PY (7 components)
• A new build diesel or gas grid support plant
• An Existing diesel grid support plant
• An Exiting diesel grid support plant
Active • 2025-26 (T-1), 2024-25 (T-1) ...
4.68 MW
Pye Bridge Industrial Estate, Somercotes, Alfreton, DE55 4NX (16 components)
• Additional reciprocating gas engines running on natural gas returned to service
• Reciprocating gas engines running on natural gas
Active • 2027-28 (T-4), 2026-27 (T-4) ...
22.77 MW
Prowse's Lane, Axbridge, BS26 2HP. (4 components)

Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.57 MW
Prince of Wales Energy Park Land off Skinner Lane Pontefract WF8 1HG (2 components)

Gas reciprocating engines

Active • 2025-26 (T-4), 2024-25 (T-1)
On land off Nairn Road, Deans Industrial Estate, Livingston, EH54 8AY (6 components)

A new build, gas fuelled generation station.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Old Littleton Road, Chertsey, Surrey, TW17 9NU (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.79 MW
Newton Aycliffe CO Durham DL5 6EA (17 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.78 MW
Newmarket Lane Stanley Near Wakefield WF3 4BY (2 components)

Gas reciprocating engines

Active • 2025-26 (T-4), 2024-25 (T-1)
Neston Power Generation Plant, Longacres Road, Clayhill Light Industrial Park, Neston, CH64 3RL (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-1)
Millfield Lane Haydock Industrial Estate Haydock St Helens WA11 9UT (13 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.80 MW
M65, Accrington BB5 5WE (8 components)
• Gas fired reciprocating engines.
• gas fired reciprocating engines
Active • 2024-25 (T-1), 2020-21 (T-4) ...
Loading map...
Showing 25 locations