Reciprocating engines

15 unique locations (218 components)

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (66 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Water Tower, Knight Street, Pinchbeck, Spalding, PE11 3XD (3 components)
• 2.6MW of demand reduction
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear
Active • 2024-25 (T-1), 2023-24 (T-4)
0.09 MW
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (15 components)
• 6 x reciprocating engines
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
• Distribution Centre with behind the meter back-up generation.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Shawhouse farm, Clitheroe Road, Clitheroe, Lancashire, BB7 9AD (4 components)
• 2 X 2MW gas fuelled engines installed on a compound at Shawhouse farm.
• 4 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Pierces Farm, Field off Goring Lane, Grazeley Green, Reading, Berkshire. RG7 1LY (5 components)
• 1 x 250Kw/250KWh Lithium Ion Battery
• CMU consisting of a reciprocating engine and alternator
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Land off Amy Johnson Way, Blackpool, FY4 2RS (14 components)
• A gas fuelled generating station.
• Connah's Quay PS Unit 1 CCGT
• Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear
Active • 2028-29 (T-4), 2023-24 (T-4) ...
6.54 MW
41.27 MW
Land At Mitchells Industrial Park, Bradberry Balk Lane, Wombwell, Barnsleym, S73 8HR (17 components)
• 5 MW of demand reduction
• CHP Unit
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
7.44 MW
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (10 components)
• 0.250MW Battery Energy Storage System
• 10 x 2MW gas generator units to be installed on designated land within Southbrook Farm
• 5MW of demand reduction
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Bourne Park Solar Farm, Bourne Park, Piddlehinton, Dorset. DT2 7TU (4 components)
• 800kW/ 1100kWh BYD Lithium Ion Battery
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Bevercotes Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (5 components)
• 3 x 1MW / 1.2 MWh BYD Lithium Ion Battery
• a new build gas generating station
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Ashford Rd, Charing TN27 0DF, United Kingdom (10 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• N/A
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.45 MW
Ardagh Group - Barnsely Site 2, Burton Road, Monk Bretton South Yorkshire S71 5RP (18 components)
• 3.6MW of demand reduction
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.11 MW
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (16 components)
• 1.200MW BESS
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• District heating implementation of two gas CHP engines with no auxilliary load
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.27 MW
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (19 components)
• Battery Storage Plant
• Load reduction on site supported by non-exporting standby generation.
• Reciprocating genset in acoustic enclosure
Active • 2025-26 (T-4), 2023-24 (T-4) ...
53.56 MW
Loading map...
Showing 15 locations