Reciprocating engines

14 unique locations (398 components)

1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (9 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
59.66 MW
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (30 components)
• The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component BREH01 consists of one CHP engine supplying heat, CO2 and power to the on site Nursery.
• The CMU component BREH02 consists of one CHP engine supplying heat, CO2 and power to the on-site Nursery.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
95.49 MW
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (166 components)
• Generating Unit 3
• Genset 1.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
13899.76 MW
Hamilton Road, Sutton-in-Ashfield, NG17 5ES (9 components)
• A 7MW new build gas fuelled generating station.
• A new build gas fuelled generating station.
• To be confirmed once CMU components are known
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
3.80 MW
Land adjacent to Netherlands Way / Europa Way Stallingborough Grimsby DN41 8DT (6 components)
• 10 x 2MW gas reciprocating engines
• 10x 2MW Gas Reciprocating Engines
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land off Nottingham Rd, Loughborough Leicestershire LE11 1ET (18 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Aggregate CMU from multiple sources
• Gas fired reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
3.80 MW
Lochawe, Dalmally, Argyll, PA33 1AN, Scotland (25 components)
• Refurbishment Unit 4 Cruachan pump storage hydro plant
• Unit 1 Cruachan pumped storage hydro plant
• Unit 2 Cruachan pumped storage hydro plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
827.61 MW
Meek Street, Royton, Oldham, Lancashire OL2 6HL (5 components)
• Battery Storage Facility
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
38.04 MW
Meol Cop Centre, Meols Cop Rd, Southport PR9 7RG (2 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Gas Fired Reciprocating engines
Inactive • 2023-24 (T-4), 2020-21 (T-4)
Plot 4, South Kirkby Business Park, Hemsworth, WF9 3TJ (7 components)
• A 8MW New Build gas fuelled generating station.
• Gas fired reciprocating engines.
• Generating Unit 2
Active • 2026-27 (T-4), 2023-24 (T-4) ...
20.96 MW
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (48 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
32.05 MW
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (18 components)
• E1000 CHP
• Gas CHP in St. Austell
• Gas fired CHP unit
Active • 2026-27 (T-4), 2025-26 (T-4) ...
15.24 MW
Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (25 components)
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
• Standby generation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.06 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (30 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2330.50 MW
Loading map...
Showing 14 locations