Reciprocating engines

30 unique locations (278 components) - Page 1 of 2

WTI UK Ltd Parc Adfer, Weighbridge road, Deeside Industrial Estate zone 4, Flintshire, CH5 2LL (9 components)
• An energy from waste facility located in North Wales and designed to generate electricity
• Enfield CCGT Power Station - (one unit station)
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
30.12 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (47 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
232.80 MW
Windsor Battery East, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (10 components)
• Battery Storage
• Gas reciprocating engines
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.09 MW
Whitwell Energy Park, Southfield Lane, Whitwell, Derbys S80 3LH (7 components)
• Gas reciprocating engines
• Reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
2.07 MW
Whitwell Energy Park, Southfield Lane, Whitwell, Derbyshire, S80 3LH (9 components)
• CHP
• Gas reciprocating engines as the generating unit.
• Standby diesel generator that reduces site load when generating.
Active • 2027-28 (T-4), 2023-24 (T-4) ...
Wheldale Generation Site Wheldon Road Castleford West Yorkshire WF10 2RT (7 components)
• Battery located behind the meter within football stadium, able tor educe imported electricity and/or export to the local network
• Commercial sites
• Gas reciprocating engines.
Active • 2024-25 (T-4), 2024-25 (T-1) ...
6.38 MW
Wheldale Energy Park Wheldale Road Castleford West Yorkshire WF10 2RT (2 components)

Gas fired reciprocating engines

Inactive • 2023-24 (T-4), 2022-23 (T-3)
6.22 MW
Warsop Energy Park, Carter Lane, Warsop Vale, NG20 8XG (28 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.07 MW
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FN (4 components)
• Gas fired generating unit
• Gas generating unit(s)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Toray 2, Toray Textiles, Import Way Crown Farm Way Mansfield NG19 0FN (3 components)

Gas generating unit(s)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (5 components)
• Gas fired generating unit
• Gas generating unit(s)
• Gas reciprocating engines
Active • 2024-25 (T-1), 2023-24 (T-4) ...
Sutton Courtenay Landfill Site, Appleford Sidings, Sutton Courtenay, Abingdon, Oxfordshire, OX14 4PW (4 components)
• Gas fired reciprocating engine(s)
• Solar PV generation site
• The site comprises of gas reciprocating unit(s)
Active • 2025-26 (T-4), 2023-24 (T-4) ...
3.37 MW
Shirebrook 2 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (8 components)
• 1 x jenbacher JGS616 GS
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Shirebrook 1 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (7 components)
• 4x Jenbacher JGS 616 GS
• Gas reciprocating engines
• Gas reciprocating engines.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
6.84 MW
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (10 components)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
• Gas reciprocating engines.
Active • 2024-25 (T-1), 2023-24 (T-4) ...
34.08 MW
Old Mill Industrial Estate, Mansfield, NG18 2AT (10 components)
• Gas fired reciprocating engines
• Gas reciprocating engines
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Manvers, Callflex Business Park, South of Doncaster Road, Rotherham, S63 7EF (2 components)
• A gas fuelled generating station.
• Gas reciprocating engines as the generating unit.
Active • 2027-28 (T-4), 2023-24 (T-4)
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (Nearest postcode to grid reference: M33 2JT). (9 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Battery Storage Plant
• Single Shaft CCGT (Module 2)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land off Skinner Lane, Pontefract, WF8 1HG (20 components)
• Gas fired generating unit
• Gas fired reciprocating engines
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land off Ely Road, Chittering, Cambridge, Cambridgeshire, CB25 9PN (9 components)
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switchgear and associated controls with a total connection capacity of 9MW.
• Genset 3
• The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 MW.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
24.30 MW
Land adjacent to Netherlands Way / Europa Way Stallingborough Grimsby DN41 8DT (6 components)
• 10 x 2MW gas reciprocating engines
• 10x 2MW Gas Reciprocating Engines
• Gas reciprocating engines
Active • 2024-25 (T-1), 2023-24 (T-4) ...
38.91 MW
Gedling Energy Park, Land off Arnold Road, Gedling, Nottingham NG4 4HG (4 components)
• Gas fired reciprocating engines
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Coatbridge, ML5 4UG, Scotland (3 components)
• Energy from Waste facility
• Gas fired reciprocating engines
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 25 locations