Reciprocating engines

128 unique locations (989 components) - Page 1 of 6

Yew Tree Nursery, Guildford Road, Cranleigh, GU6 8PA (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2026-27 (T-4), 2025-26 (T-4) ...
17.13 MW
Wellington Street, Oldham, Lancashire OL4 1SA (8 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
18.20 MW
Units A, B, C and D, Postley Road, Kempston, Bedford, MK42 7AG (9 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2023-24 (T-1) ...
17.36 MW
Unit 7, Cambridgeshire Business Park, Angel Drove, Ely CB7 4DT (5 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.44 MW
Unit 7, Cambridgeshire Business Park, Angel Drove, Ely CB7 4DT (1 component)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-1)
4.83 MW
Unit 1 Lanes Farm Marlborough Road Royal Wootton Bassett Swindon SN4 7SA (16 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-4) ...
12.37 MW
Unit 1 Lanes Farm Marlborough Road Royal Wootton Bassett Swindon SN4 7SA (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
6.19 MW
Tweedale Way, Oldham OL9 8EH (8 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2024-25 (T-1) ...
8.68 MW
Titanium Road, Cocket, Swansea, SA5 4NH (7 components)
• New build site with gas reciprocating engines to replace diesel plant
• STOR diesel engines that will operate environmentally with mixed fuel
Active • 2026-27 (T-4), 2025-26 (T-4) ...
18.96 MW
Sparrowhawk Road, Halesworth, East Suffolk, IP19 8QW (6 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-1) ...
6.85 MW
SOUTH CLOSE ROSYTON SG8 5UH (10 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.74 MW
SOUTH CLOSE ROSYTON SG8 5UH (4 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
3.74 MW
Salford Road, Over Holton, Bolton, Lancashire BL5 1BW (6 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
19.04 MW
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (10 components)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.95 MW
Rhodesia Power Limited, Highgrounds Industrial Estate Highgrounds road, Rhodesia, Worksop, S80 3AT (4 components)

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial …

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.87 MW
Rhodesia Power Limited, Highgrounds Industrial Estate Highgrounds road, Rhodesia, Worksop, S80 3AT (1 component)

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial …

Inactive • 2023-24 (T-1)
9.52 MW
Rectory Field, Cards Road, Sandon, CM2 7AE (8 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
38.38 MW
Pye Bridge Industrial Estate, Somercotes, Alfreton, DE55 4NX (16 components)
• Additional reciprocating gas engines running on natural gas returned to service
• Reciprocating gas engines running on natural gas
Active • 2027-28 (T-4), 2026-27 (T-4) ...
22.77 MW
Prowse's Lane, Axbridge, BS26 2HP. (4 components)

Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.57 MW
Port Talbot, Port Talbot Works, SA13 2NG (14 components)
• Site based CHP ( reclassified from reciprocating engine for EMR purposes given definitions in Capacity Market Auction Guidelines )
• Site based CHP - note the primary fuel are Waste Gases
• Site based auto-generation unit ( classified as reciprocating engine for EMR purposes given a Rule Change in 2018 )
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
38.15 MW
Plot D2, Kingdom Avenue, Westbury, Wiltshire, South West England, England, BA13 4EW (8 components)

A 7.220MW reciprocating gas engine power plant comprising of 5 x 1.5MW engines to be installed on designated land at West Wilts Trading Estate.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
19.62 MW
Pandora Business Park Greengate Middleton Manchester M24 1RU (13 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-4) ...
16.37 MW
Pandora Business Park Greengate Middleton Manchester M24 1RU (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
8.19 MW
Old Littleton Road, Chertsey, TW17 9NU (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2026-27 (T-4), 2023-24 (T-1)
51.40 MW
Old Church Lane Billericay CM13 1UP (8 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-1) ...
19.04 MW
Loading map...
Showing 25 locations