Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

33 unique locations (143 components) - Page 1 of 2

Units 1-4, Hirwaun Industrial Estate, Hirwaun, Aberdare, S Wales, CF44 9UY (6 components)
• A new 299MW Open Cycle Gas Turbine peaking plant
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.
Active • 2026-27 (T-4), 2023-24 (T-4) ...
456.92 MW
Unit 1-3, 135A Business Park, Armoury Road, Small Heath, Birmingham, B11 2RQ (2 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
Inactive • 2022-23 (T-4)
The land South-West of the Dunoon Electrical Substation located on Ardnadam Farm, Sandbank, Dunoon, Argyll and Bute, PA23 8PN (2 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Battery energy storage system, together with associated equipment, infrastructure and ancillary works.
Active • 2027-28 (T-4), 2022-23 (T-4)
5.23 MW
The Bath Inn, Wheldon Road, Castleford WF10 2RY (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Tarmac, Anderton Road, Small Heath, Birmingham, B11 1TG (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (9 components)
• CMU consisting of multiple reciprocating engines and alternators
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2027-28 (T-4), 2025-26 (T-1) ...
15.20 MW
SOUTH OF NATIONAL GRID IVER SUBSTATION, SLOUGH ROAD, IVER HEATH UB8 2FX (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Prowse's Lane, Axbridge, BS26 2HP (4 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
6.65 MW
Morgans of Usk Ontario Works Gate 3, Pontyfelin Industrial Estate New Inn Pontypool NP4 0DQ (4 components)
• A new build diesel and/or gas dual fuel generating station consisting of 45 generator units of 440KW each
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Inactive • 2022-23 (T-4), 2017-18 (T-1)
Meadow Lane, Long Eaton, Nottingham, NG10 2GD (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Mannelli House, Cowper Road, Gilwilly Industrial Estate, Penrith, CA11 9BN (6 components)
• 6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2024-25 (T-1), 2023-24 (T-4) ...
0.66 MW
Major Street, Wolverhampton, WV2 2EG (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Liverpool Street, Bordesley, Birmingham, B9 4DS (2 components)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (9 components)
• 4 gas reciprocating engines used for power generation, with associated infrastructure.
• A 49.5MW battery energy storage system
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.04 MW
Land off Nottingham Rd, Loughborough Leicestershire LE11 1ET (18 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Aggregate CMU from multiple sources
• Gas fired reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
3.80 MW
Land off Mount Road, Castle Gresley, Swadlincote, DE11 9ES (4 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land off Batham Gate Road, North of Buxton, SK17 7HS (2 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• This is a new battery storage plant, based on of lithium ion cells to be installed in multiple ISO compliant battery containers.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land at Unit 6, Caldershaw Centre, Ings Lane, OL12 7LQ (6 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.31 MW
Land at Stainburn Road, Stainburn Road, Great Clifton, Derwent Vale, CA14 1TG (11 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Standby generation DRUPs taking site load. No export
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land at Newland Lane, Welbeck Road, Normanton, WF6 1AL (2 components)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Land at Langley's Lane, Old Mills, Radstock, BS39 7SS (5 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
5.70 MW
Land at J Priestly & Son, William Street, Littleborough, OL15 8JP (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Land At Herrod Avenue, Off Haigh Avenue, South Reddish, Stockport, SK5 7NW (4 components)
• 3 x 1.5 MW gas generator units to be installed at Land At Herrod Avenue, Off Haigh Avenue, South Reddish, Stockport, SK5 7NW.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
8.57 MW
Land at Fulscot, Didcot, OX11 9AA (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Land at Dig Gate Lane, Kingsway Business Park, Rochdale, OL16 4NR (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Active • 2024-25 (T-4), 2022-23 (T-4)
4.19 MW
Loading map...
Showing 25 locations