Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

15 unique locations (355 components)

Warsop Energy Park, Carter Lane, Warsop Vale, NG20 8XG (28 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.07 MW
Wallingford Road, Goring, Reading, RG8 0HS (3 components)
• A 6.9MW gas fuelled generating station.
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2025-26 (T-1), 2022-23 (T-4)
12.90 MW
Unit 1-3, 135A Business Park, Armoury Road, Small Heath, Birmingham, B11 2RQ (2 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
Inactive • 2022-23 (T-4)
Saltend Power Station Saltend Hull HU12 8GA (30 components)
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3486.78 MW
Poole Bank Nurseries , Common Lane, Welton, Hull, HU15 1UT (18 components)
• Aggregate CMU from multiple sources
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2024-25 (T-4) ...
287.90 MW
Mannelli House, Cowper Road, Gilwilly Industrial Estate, Penrith, CA11 9BN (6 components)
• 6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2024-25 (T-1), 2023-24 (T-4) ...
0.66 MW
LONG ACRE FARM, BIRTLEY, CHESTER LE STREET, DH3 1RQ. (Nearest postcode to grid reference: NE9 7UA). (7 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• Component has yet to be procured.
• Gas peaking reciprocating engine
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land North East Of East Sleekburn C415 Spine Road To East Sleekburn, Bedlington, Northumberland, NE22 7BG (8 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• NSL is a 1,400 MW subsea high-voltage direct current electricity cable under construction between Norway and the United Kingdom which will connect the Transmission Systems of Norway and Great Britain. The cable will run from Kvilldal in Norway, to Blyth in the United Kingdom. The converter station in England will be located near to the cable landfall in East Sleekburn village and it will be connected to the National Grid at the Blyth substation.
• New build power station comprised of multiple reciprocating engines.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
1218.00 MW
Land at Woolaston Road, Park Farm Industrial Estate, Redditch, B987SG (11 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
18.60 MW
Land at Silverwood colliery site, Hollings lane, Ravenfield, Rotherham, S65 4LQ. (4 components)
• A 20MW New Build gas fuelled generating station.
• A New Build gas fuelled generating station.
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2022-23 (T-4) ...
269.81 MW
Land at Model Farm, Frenchs Road, Walpole St. Andrew, Norfolk, PE14 7JE. (17 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 2026 kW CHP unit
• N/A
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
252.48 MW
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (42 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• On-site existing CHP generating unit
Active • 2027-28 (T-4), 2024-25 (T-4) ...
Asda Scunthorpe, Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (9 components)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on flexible electricity consuming processes
Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.73 MW
4 Chemistry Ln, Pentre, Deeside, CH5 2DA (16 components)
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage).
• Peak power plant
• Reciprocating engine
Inactive • 2022-23 (T-4), 2021-22 (T-1) ...
Loading map...
Showing 15 locations