Reciprocating engines

7 unique locations (84 components)

Merseyside Waste Disposal Unit, The Old Coal Depot, Wallesey Bridge Road, Bidston Moss, Birkenhead, CH41 1EB (16 components)
• Generator at the Hospital
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land on the south west of Brigg Road, Scunthorpe, North Lincolnshire, DN16 1AP (21 components)
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
• Multiple gas engines capable of exporting electricity.
• The CMU is a Open Cycle Gas Turbine (OCGT)
Active • 2026-27 (T-4), 2024-25 (T-4) ...
323.62 MW
Harworth Colliery, Harworth Park Industrial Estate, Scrooby Road, Harworth, Doncaster, South Yorkshire, DN11 8AB. (9 components)
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 MW.
• 3 x Jenbacher 420 (1.4MW)
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Active • 2024-25 (T-1), 2023-24 (T-4) ...
0.89 MW
Devon Street, Birmingham, B7 4TH (3 components)
• A gas fuelled generating station.
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
Active • 2024-25 (T-4), 2022-23 (T-3)
6.67 MW
Chineham ERF, Whitmarsh Lane, Basingstoke, Hampshire, RG24 8LL (8 components)
• Municipal waste incineration plant located in Chineham Hampshire. It is based on one boiler supplying steam to a turbine-generator.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• Unproven DSR yet to be procured
Active • 2028-29 (T-4), 2023-24 (T-4) ...
20.13 MW
167 - 600 Hollands Recycling, Bentley Road South, Darlaston, WS10 8LN (14 components)
• Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
• The facility consists of a series of gas fired generators. It connects to SPEN's network at 33kV.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
132 Manchester Road, Carrington, Manchester, M31 4AY (13 components)
• 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
• Poole Existing Site CHP
Active • 2027-28 (T-4), 2024-25 (T-4) ...
1763.05 MW