Reciprocating engines

14 unique locations (310 components)

4 Finway Road Hemel Hempstead HP2 7PT (11 components)
• 14.710 MW CHP generation
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2024-25 (T-4), 2022-23 (T-3) ...
4.76 MW
Abergelli Power Station, Felindre, Swansea, SA5 7NN (4 components)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (15 components)
• A New Build 2.5MW Generation Battery Site
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.31 MW
Askern CMM Generation, Campsall Road, Askern, Doncaster DN6 0FD (16 components)
• Gas fired reciprocating engines
• Gas-fired reciprocating engines
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.02 MW
Bourton, Buckingham, MK18 7DU (2 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• N/A
Inactive • 2022-23 (T-4), 2022-23 (T-3)
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
252.48 MW
Crosby Power, Church Street, Bootle, L20 1AF (7 components)
• CMU consisting of multiple reciprocating engines and alternators
• N/A
Active • 2025-26 (T-4), 2023-24 (T-1) ...
8.20 MW
Dorehouse Business Park Sheffield S13 9LT BB10 2TN (8 components)
• 1 x hydro turbine & synchronous generator
• Aggregate CMU from multiple sources
• Gas fired reciprocating engines.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Land off Salmon Lane, Annesley, Nottinghamshire NG15 0DF (10 components)
• New reciprocating gensets in acoustic enclosure
• Onsite load reduction and back up generation behind the meter on multiple sites
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
7.44 MW
Manchester Rd, Carrington, Manchester M31 4TG (32 components)
• 2 x 2.5 MW gas fuelled generators installed on land east of Griffiths Road.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
12.59 MW
Maybrook Road, Maybrook Business Park, Minworth, Sutton Coldfield, B76 1BE (18 components)
• N/A
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
12.09 MW
Northern Steel Stocks, Cross Street, Wolverhampton, WV1 2HS (15 components)
• Gas reciprocating engine
• N/A
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Shawhouse Farm, Clitheroe Road, Clitheroe, Lancashire, BB7 9AD (3 components)
• 10 x 2 MW Gas fuelled engines with connections to the distribution and gas networks. The engines will be sited on a compound at Shawhouse Farm, Clitheroe, BB7 9AD
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Wincham Lane, Wincham, Northwich, CW9 6DE (15 components)
• N/A
• New build power station comprised of multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 14 locations