Reciprocating engines

125 unique locations (1429 components) - Page 1 of 5

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (52 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
• ... and 1 more unique description
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.23 MW
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (20 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• 16 MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
74.02 MW
West Road North, Cross Green, Leeds, West Yorkshire, LS10 1RR (2 components)
• Gas engines in a peaking plant environment
• New gas engines in a peaking plant environment, servicing power generation and DSR.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Waun y Pound Industrial Estate, Ebbw Vale, South Wales, NP23 6PL (25 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution and gas networks.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (16 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
59.11 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (18 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.89 MW
Water Treatment Plant & Premises, Land to the south of Rumer Hill Road, Cannock WS11 8EX (2 components)
• Gas fired generating unit(s)
• Gas fired generating units
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Warsop Energy Park, Carter Lane, Warsop Vale, NG20 8XG (26 components)
• 1 x MWM TBG2016 engine 1.35MW
• Gas fired generating unit
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (23 components)
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
• CMU consisting of multiple reciprocating engines and alternators
Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.06 MW
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (18 components)
• Gas reciprocating engine
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (18 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
• Reciprocating Engine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
58.74 MW
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury BL9 0LU (11 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Unit 2, 105 Abercorn Street, Paisley, PA3 4AT (18 components)
• New build gas generator
• Operational reciprocating gas engines
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.06 MW
Trumfleet Generation Site, Marsh Lane, Trumfleet, Doncaster. DN6 0DU (15 components)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
• ... and 1 more unique description
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (26 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
37.65 MW
The Power House 38 Haughton Road Darlington DL1 1ST (11 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 17.5MW of containerised, gas-fired generating capacity together with transformers, switchgear and associated control gear
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (22 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.52 MW
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (20 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
37.65 MW
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (16 components)
• 6 x reciprocating engines
• Aux. load separately metered
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (32 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.39 MW
Sutton Manor Grid Capacity Site, Union Bank Farm, Warrington Road, Bold Bridge, St Helens, WA8 5UT (8 components)

3.000MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.64 MW
Stillingfleet Colliery Cawood Road, Stillingfleet Moor, Stillingfleet, Yorkshire, YO19 6HS (5 components)
• 1 x Jenbacher 420 (1.4MW)
• Reciprocating Gas Engine(s)
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations