Reciprocating engines

12 unique locations (133 components)

1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (15 components)
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• A completed power plant, with associated civil works, switchgear and electrical connection.
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
7.90 MW
25 Southfield Lingard Lane Stockport SK6 2QN (16 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• Aggregate CMU from multiple sources
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Dorehouse Business Park Sheffield S13 9LT BB10 2TN (8 components)
• 1 x hydro turbine & synchronous generator
• Aggregate CMU from multiple sources
• Gas fired reciprocating engines.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Grimsby Power Station Moody Lane Grimsby DN31 2SW (9 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• Flour Mill
• Ten (10) 2MWe gas reciprocating gas engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
114.12 MW
41.27 MW
Land Towards The South West Of Moston Vale, Moston Vale, Manchester, M40 8WP (5 components)
• New build energy storage facility
• Newbuild gas generator
Active • 2026-27 (T-4), 2021-22 (T-4) ...
3.20 MW
Lymedale Business Park, Holditch Road, Newcastle-under-Lyme, ST5 9JA (8 components)
• Medway CCGT
• The CMU Component is made of brand new gas-fired engines.
• The CMU Component is made up of gas-fired engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Manvers Callflex Business Park South of Doncaster Road Rotherham S63 7EF (6 components)
• Aggregate CMU from Multiple Sources
• Gas generating unit(s)
• Gas reciprocating engines
Active • 2028-29 (T-4), 2023-24 (T-1) ...
9.58 MW
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX (12 components)
• FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• Generating Unit 2
• New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
46.94 MW
Plot 6 Barrow Man Road, Birchington CT7 0AX (19 components)
• CHP engine in a horticultural environment, natural gas, no aux load
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
14.72 MW
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (18 components)
• Aggregate CMU from multiple sources
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2026-27 (T-4), 2022-23 (T-4) ...
9.52 MW
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FN (5 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• Aggregate CMU from Multiple Sources
• Didcot B5 - CCGT
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 12 locations