16 unique locations (298 components)

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (52 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
• ... and 1 more unique description
Active • 2024-25 (T-4), 2023-24 (T-4) ...
43.67 MW
Trumfleet Generation Site, Marsh Lane, Trumfleet, Doncaster. DN6 0DU (15 components)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
• ... and 1 more unique description
Active • 2024-25 (T-4), 2023-24 (T-4) ...
4.82 MW
Substation at Saltend Lane Preston East Riding of Yorkshire HU12 8EY (6 components)
• Bio-liquid fuelled distribution connected generation station
• Gas fuelled distribution connected generation station
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
65.47 MW
Shirebrook 2 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (14 components)
• 1 x jenbacher JGS616 GS
• Gas reciprocating engines
• Gas reciprocating engines.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
34.88 MW
Shirebrook 1 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (16 components)
• Gas reciprocating engines. (4)
• Gas reciprocating engines
Active • 2028-29 (T-4), 2026-27 (T-4) ...
33.95 MW
Private Road No.5, Colwick, Nottingham, NG4 2JU (8 components)

New reciprocating genset in acoustic enclosure

Inactive • 2020-21 (T-4), 2019-20 (T-1)
37.37 MW
Ongar Landfill Site Mill Lane High Ongar Essex CM5 9RG (8 components)
• 2 gas reciprocating engines rated at approximately 1MW each. All associated gas delivery equipment and switchgear is included. The generating units are connected top the distribution network.
• Gas fired reciprocating engine(s)
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
5.23 MW
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (16 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear

Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.13 MW
Kiln Power, Unit 6, Lime Kilns Business Park, Nutts Lane, Hinckley, Leicestershire, LE10 3EL. (34 components)
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. connections and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
104.95 MW
Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS (19 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
75.02 MW
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (19 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
55.90 MW
47.80 MW
Cavendish Road 33kV Generation, Land Behind Caswell House, Cavendish Road, Stevenage, SG1 2ET (16 components)
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.74 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (40 components)
• The CMU component is a combined cycle gas turbine
• This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
• This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2820.73 MW
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (15 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
56.20 MW
Aveley (N) Sandy Lane Aveley South Ockendon Essex RM15 4XP (9 components)
• Gas fired generating unit
• The site comprises of four gas reciprocating engines with an assumed output of 4.6MW. The reciprocating engines are connected to the distribution network.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
11.53 MW
Loading map...
Showing 16 locations