Reciprocating engines

50 unique locations (550 components) - Page 1 of 2

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (52 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
• ... and 1 more unique description
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (3 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
Active • 2028-29 (T-4), 2017-18 (T-1)
3.08 MW
Whitwell Energy Park, Southfield Lane, Whitwell, Derbyshire, S80 3LH (8 components)
• 1 x 2MW gas gen sets at Whitwell Energy Park.
• Gas reciprocating engines as the generating unit.
Active • 2027-28 (T-4), 2020-21 (T-4) ...
Waun y Pound Industrial Estate, Ebbw Vale, South Wales, NP23 6PL (25 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution and gas networks.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (16 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
59.11 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (18 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.89 MW
Warsop Energy Park, Carter Lane, Warsop Vale, NG20 8XG (26 components)
• 1 x MWM TBG2016 engine 1.35MW
• Gas fired generating unit
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Unit F Prestige House Cornford Road Blackpool FY4 4QQ (5 components)

New build gas generator

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Unit F Prestige House Cornford Road Blackpool FY4 4QQ (3 components)

New build gas generator

Inactive • 2019-20 (T-1), 2017-18 (T-1)
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (18 components)
• Gas reciprocating engine
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Unit A Broadway Industrial Estate Broadway Hyde SK14 4QF (5 components)

New build gas generator

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Unit A Broadway Industrial Estate Broadway Hyde SK14 4QF (3 components)

New build gas generator

Inactive • 2019-20 (T-1), 2017-18 (T-1)
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (18 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
• Reciprocating Engine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
58.74 MW
Unit 1b Newhouse Road Huncoat Accrington BB5 6NT (6 components)

New build gas generator

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Unit 1b Newhouse Road Huncoat Accrington BB5 6NT (3 components)

New build gas generator

Inactive • 2019-20 (T-1), 2017-18 (T-1)
Unit 19 Lowther Road Clay Flatts Industrial Estate Workington CA14 2TQ (4 components)

New build gas generator

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Unit 19 Lowther Road Clay Flatts Industrial Estate Workington CA14 2TQ (3 components)

New build gas generator

Inactive • 2019-20 (T-1), 2017-18 (T-1)
Titanium Road, Waunarlwydd, Swansea, SA5 4SG (9 components)
• Gas fired reciprocating engines
• Gas fired reciprocating engines.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (22 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.52 MW
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (16 components)
• 6 x reciprocating engines
• Aux. load separately metered
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Substation at Saltend Lane Preston East Riding of Yorkshire HU12 8EY (6 components)
• Bio-liquid fuelled distribution connected generation station
• Gas fuelled distribution connected generation station
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Shirebrook 1 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (16 components)
• Gas reciprocating engines. (4)
• Gas reciprocating engines
Active • 2028-29 (T-4), 2026-27 (T-4) ...
13.75 MW
Shirebrook 1 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (4 components)
• 4x Jenbacher JGS 616 GS
• Gas reciprocating engines.
Active • 2028-29 (T-4), 2017-18 (T-1)
6.84 MW
Poole Bank Nurseries , Common Lane, Welton, Hull, HU15 1UT (19 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Old Mill Industrial Estate, Mansfield, NG19 9BG (10 components)
• 1 x MWM TCG 2016V
• Gas fired generating unit
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Loading map...
Showing 25 locations