Open Cycle Gas Turbine (OCGT)

76 unique locations (1502 components) - Page 2 of 4

New Hall Farm School Lane Birchwood Warrington WA3 6LH (3 components)

New Gas fulled generation station (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (33 components)
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes (2)
• The CMU is a Open Cycle Gas Turbine (OCGT)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2314.80 MW
Mill Lane, Kirkby in Ashfield, NG17 9LG (1 component)

5 x2MW gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2019-20 (T-1)
Millbrook Power Station, Rookery South Pit, Green Lane, Stewartby, Bedfordshire MK43 9LX (3 components)
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant (2)
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Lynchford Lane, Farnborough, GU14 6LW (4 components)

10 gas reciprocating engines used for power generation, with associated infrastructure. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Little Barford Power Station Little Barford St Neots PE19 6YT (22 components)
• Little Barford 1 CCGT MSID: 4052 (2)
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2060.91 MW
Little Barford Power Station Little Barford St Neots PE19 6YT (24 components)
• Little Barford 1 CCGT MSID: 4052 (3)
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052 (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2060.91 MW
Land West of Yelland Quay, West Yelland, Yelland, Barnstaple, EX31 3HB (1 component)

10 x 2MW gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2022-23 (T-4)
Land off Well Street, Paisley, PA1 2QH (4 components)

4 gas reciprocating engines used for power generation, with associated infrastructure. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land off Bicester Road Bicester Oxfordshire OX26 6EP (1 component)

Gas fuelled generation plant

Inactive • 2022-23 (T-4)
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components)
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery …
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a gas …
Active • 2027-28 (T-4), 2026-27 (T-4) ...
817.08 MW
land at Hoon Hay Farm, Marston Lane, Hatton, Derbyshire, DE65 5EA (1 component)

gas powered generator to be installed on designated land within a manufacturing compound at the Hoon Hay Farm.

Active • 2024-25 (T-4)
Land adjacent to Brynfyrd, Botley Road, Romsey, SO52 9DP (1 component)

10 x 2MW gas powered generator units to be installed on designated land within a manufacturing compound at the Botley Farm.

Inactive • 2021-22 (T-1)
Land adjacent to Brynfyrd Botley Road Romsey SO52 9DP (3 components)

Gas fuelled generation plant (2)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Knapton Generating Station, East Knapton, Malton, North Yorkshire, YO17 8JF (3 components)

Generating Station, the power generation facilities consist of RLM 6000 EGT generation package with a LM6000 gas turbine (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (39 components)
• Keadby 1 CCGT (2)
• Keadby GT3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4933.66 MW
Fort Parkway Heartlands Birmingham B24 9QT (16 components)

Existing OCGT (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
267.28 MW
Fort Parkway Heartlands Birmingham B24 9QT (16 components)

Existing OCGT (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
267.28 MW
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (86 components)
• Generating Unit 1
• Generating Unit 2
• Generating Unit 3
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 25 locations