Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

5 unique locations (63 components)

Active MW: 111795.11 MW
Inactive MW: 832.90 MW
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (20 components)
• A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load. (2)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
867.73 MW
West Marsh Road, Spalding, Lincolnshire, PE11 2BB (8 components)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1734.13 MW
West Marsh Road, Spalding, Lincolnshire, PE11 2BB (6 components)
Active • 2029-30 (T-4), 2028-29 (T-4) ...
2596.64 MW
West Marsh Road Spalding Lincolnshire PE11 2BB (9 components)
Combined Cycle Gas Turbine (CCGT) SPALDING ENERGY COMPANY, LTD. Spalding Energy Expansion Spalding Energy Expansion PE11
Active • 2029-30 (T-4), 2028-29 (T-4) ...
2596.64 MW
Loading map...
Showing 5 locations