Open Cycle Gas Turbine (OCGT)

5 unique locations (14 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
King?s Lynn Power Station, Willows Business Park, Saddlebow, Kings Lynn, PE34 3RD (3 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive β€’ 2020-21 (T-4), 2019-20 (T-1) ...
RWE Cogen UK (Hythe) Ltd, Charleston Road, Hardley, Hythe, Southampton, SO45 3BP (4 components)
β€’ Hythe Power Station - Auxiliary load behind boundary meter
β€’ Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
β€’ Three (3) Reciprocating Gas Engines
Inactive β€’ 2021-22 (T-4), 2020-21 (T-4) ...
RWE Cogen UK Limited, North South Access Road, Seal Sands, Middlesbrough, TS2 1FB (1 component)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT

Inactive β€’ 2021-22 (T-4)
RWE Generation UK plc, Ferrybridge A Workshop Site, Old Great North Road, Knottingley, WF11 8PR (1 component)

A CMU will be formed of an Open Cycle Gas Turbine unit.

Inactive β€’ 2022-23 (T-4)
Seals Sands Power Station, North South Access Road, Seal Sands, Middlesbrough, TS2 1FB (5 components)
β€’ One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
β€’ One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 5 locations