Open Cycle Gas Turbine (OCGT)

19 unique locations (736 components)

111 Brancroft Way Enfield Middlesex EN3 7PL (22 components)

Enfield CCGT Power Station - (one unit station)

Active • 2024-25 (T-4), 2025-26 (T-4) ...
1595.21 MW
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA. (16 components)
• Small gas fired CCGT.
• Small gas fired OCGT.
Active • 2023-24 (T-1), 2024-25 (T-4) ...
186.17 MW
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (42 components)
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation please see letter uploaded to metering section that explains determination of three highest HH
Active • 2023-24 (T-4), 2024-25 (T-4) ...
2096.76 MW
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (33 components)
• Cowes 1 - OCGT, fuel is distillate MSID: 4548
• Cowes 1 - OCGT, fuel is gas-oil
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
Active • 2023-24 (T-4), 2024-25 (T-4) ...
496.48 MW
Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU (39 components)
• Didcot B5 - CCGT
• Didcot B5 - CCGT MSID: 4055
• Didcot B6 - CCGT MSID: 4055
Active • 2024-25 (T-4), 2025-26 (T-4) ...
4732.58 MW
Didcot OCGT Power Station Didcot Oxfordshire OX11 7HA (80 components)
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• Didcot 3 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• Didcot 4 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
Active • 2024-25 (T-4), 2025-26 (T-4) ...
565.82 MW
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (65 components)
• Keadby 1 CCGT
• Keadby GT3
• Single combined cycle gas turbine
Active • 2024-25 (T-4), 2025-26 (T-4) ...
6623.53 MW
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (77 components)
• Connah's Quay PS Unit 1 CCGT
• Connah's Quay PS Unit 3 CCGT
• Connah's Quay PS Unit 4 CCGT
Active • 2024-25 (T-4), 2025-26 (T-4) ...
2714.06 MW
Kingsnorth, Hoo, Rochester, Kent, ME3 9TX (7 components)
• A new Combined Cycle Gas Turbine unit (unit 4) at Damhead Creek 2 power plant
• A new combined cycle gas turbine (unit 5) at Damhead Creek 2 power plant
• Combined Cycle Gas Turbine plant
Active • 2024-25 (T-4), 2025-26 (T-4) ...
5480.84 MW
Marchwood Power, Marchwood Industrial Park, Oceanic Way, Marchwood, Southampton, SO40 4BD (19 components)
• Gensets 1. 2 & 3
• Marchwood CCGT
Active • 2024-25 (T-4), 2025-26 (T-4) ...
3678.80 MW
Newton Aycliffe CO Durham DL5 6EA (30 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
27.91 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (56 components)
• Pembroke 11 - CCGT MSID: 7237
• Pembroke 31 - CCGT MSID: 7237
• Pembroke 41 - CCGT MSID: 7237
Active • 2024-25 (T-4), 2025-26 (T-4) ...
6359.67 MW
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (28 components)
• Peterhead 1
• Peterhead 1 for Delivery Year 2017/18 only
• Peterhead CCGT
Active • 2024-25 (T-4), 2025-26 (T-4) ...
6471.35 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (100 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• Ratcliffe Unit 3 coal-fired unit
Active • 2023-24 (T-4), 2024-25 (T-4) ...
3602.30 MW
Seabank Power Limited Severn Road, Hallen Bristol BS10 7SP (17 components)

Multi Shaft CCGT (Module 1)

Active • 2023-24 (T-4), 2024-25 (T-4) ...
2171.63 MW
Seabank Power Limited Severn Road, Hallen, Bristol BS10 7SP (15 components)

Single Shaft CCGT (Module 2)

Active • 2023-24 (T-4), 2024-25 (T-4) ...
966.27 MW
Severn Power Station West Nash Road Nash Newport NP18 2BZ (19 components)
• Existing CCGT Unit
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
Active • 2023-24 (T-4), 2024-25 (T-1) ...
1551.59 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (42 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2023-24 (T-4), 2024-25 (T-4) ...
232.80 MW
Loading map...
Showing 19 locations