Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

9 unique locations (215 components)

Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA. (16 components)
• Small gas fired CCGT.
• Small gas fired OCGT.
Active • 2023-24 (T-1), 2024-25 (T-4) ...
186.17 MW
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (15 components)
• One (1) Open Cycle Gas Turbine
• One (1) Open Cycle Gas Turbine MSID: 7382
• One (1) Open Cycle Gas Turbine MSID: 7382
Active • 2023-24 (T-1), 2023-24 (T-4) ...
249.14 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (119 components)
• West Burton A Power Station CMU 2 WA2-19 = 100% (T_WBUPS-2) + 25% (E_WBUPS-STX)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-1 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
Active • 2023-24 (T-1), 2023-24 (T-4) ...
2450.85 MW
Huntsman Drive, Seal Sands, TS2 1TT (6 components)

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural …

Active • 2023-24 (T-1), 2024-25 (T-1)
128.51 MW
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (12 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2023-24 (T-1), 2025-26 (T-4) ...
211.92 MW
116.16 MW
18.26 MW
Whitewall Road, Rochester, Kent, ME2 4DZ (5 components)

A series of gas generators on an existing site.

Active • 2023-24 (T-1), 2024-25 (T-1)
75.98 MW
Loading map...
Showing 9 locations