Open Cycle Gas Turbine (OCGT)

11 unique locations (103 components)

Active MW: 111795.11 MW
Inactive MW: 832.90 MW
Whitewall Road, Rochester, Kent, ME2 4DZ (3 components)

A series of gas generators on an existing site.

Active • 2026-27 (T-4), 2024-25 (T-1) ...
56.94 MW
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (8 components)

Gas fuelled CHP generation plant

Active • 2027-28 (T-4), 2025-26 (T-4) ...
28.50 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (11 components)
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
174.30 MW
Redditch Generation Station Windsor Road Redditch B97 6HE (3 components)

Gas turbine generator (3)

Open Cycle Gas Turbine (OCGT) ALKANE ENERGY UK LIMITED Existing Generating CMU Redditch Redditch B97
Active • 2024-25 (T-1), 2023-24 (T-1) ...
46.34 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (16 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590 (2)
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
Coal Open Cycle Gas Turbine (OCGT) UNIPER UK LIMITED Existing Generating CMU Ratcliffe GT2 Ratcliffe GT2 +13 more NG11
Active • 2025-26 (T-1), 2023-24 (T-1) ...
475.11 MW
Newton Aycliffe CO Durham DL5 6EA (6 components)

Existing Gas Engine (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
3.22 MW
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (2 components)

Existing OCGT. (2)

Open Cycle Gas Turbine (OCGT) WHITETOWER ENERGY LIMITED Existing Generating CMU Exeter Power Exeter Power EX2
Inactive • 2023-24 (T-1), 2022-23 (T-1)
41.91 MW
Huntsman Drive, Seal Sands, TS2 1TT (2 components)

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural …

Active • 2024-25 (T-1), 2023-24 (T-1)
64.03 MW
Huntsman Drive, Seal Sands, TS2 1TT (2 components)

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural … (2)

Active • 2024-25 (T-1), 2023-24 (T-1)
64.03 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (46 components)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-1 = 100% (T_WBUGT-1)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-1 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Coal Open Cycle Gas Turbine (OCGT) EDF ENERGY (THERMAL GENERATION) LIMITED Existing Generating CMU West Burton A Power Station CMU 1 West Burton A Power Station CMU 1 +11 more DN22
Active • 2026-27 (T-4), 2025-26 (T-4) ...
3081.02 MW
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (4 components)

One (1) Open Cycle Gas Turbine MSID: 7382 (3)

Open Cycle Gas Turbine (OCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_CHEGT1 CMU_CHEGT1 +2 more CH65
Active • 2025-26 (T-1), 2024-25 (T-1) ...
124.05 MW