44 unique locations (299 components) - Page 1 of 2

Active MW: 111795.11 MW
Inactive MW: 832.90 MW
1 Ratty's Lane, Hoddesdon, Hertsfordshire, EN11 0RF (5 components)

Combined Cycle Gas Turbine

Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Rye House Rye House EN11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1 Ratty's Lane, Hoddesdon. Hertsfordshire. EN11 0RF (5 components)
Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Rye House Rye House EN11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Aberthaw Power Station, The Leys, Aberthaw, Barry, Mid Glamorgan, CF62 4ZW (48 components)
• Aberthaw 7 Coal fired unit
• Aberthaw 7 OCGT fuel type distillate
• Aberthaw 7 OCGT fuel type gasoil
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Ashland Farm, Beck Lane, Skegby Sutton in Ashfield, NG19 6PG (5 components)
• NEW BUILD GAS FUELLED GENERATING STATION
• New Build gas fuelled generation station.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Baglan Bay Power Station, Baglan Energy Park, Port Talbot, SA12 7GE (18 components)
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
• Existing CCGT
• Existing CCGT Baglan Unit 1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Barking Power Station, Chequers Lane, Dagenham, Essex RM9 6PF (10 components)
• Three gas turbines operating in open cycle mode. Not a Storage Facility.
• Two gas turbines operating in open cycle mode. Not a Storage Facility
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Centrica Barry Power Station, Sully Moors Rd, Sully, CF64 5RP. (6 components)

Centrica Barry Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Combined Cycle Gas Turbine (CCGT) CENTRICA BARRY LIMITED Existing Generating CMU Barry Barry +1 more CF64
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT. (8 components)

Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (11 components)

Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Drakelow Power Station, Burton on Trent, DE15 9TZ (5 components)

The unit is a four on two air cooled CCGT utilizing Siemens Industrial Trent DLE aero-derivitive gas turbines. The plant will be located at Drakelow, South Derbyshire.

Combined Cycle Gas Turbine (CCGT) Powersite DL Ltd New Build Generating CMU Powersite DL Ltd Powersite DL Ltd +3 more Conditional DE15
Active • 2024-25 (T-4), 2023-24 (T-4) ...
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (12 components)
• West Burton B Power Station CMU 1 WB1-18= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-19= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-20= 100% T_WBURB-1
Combined Cycle Gas Turbine (CCGT) WEST BURTON B LIMITED Existing Generating CMU West Burton B Power Station CMU 1 West Burton B Power Station CMU 1 +7 more DN22
Active • 2024-25 (T-4), 2023-24 (T-4) ...
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ (10 components)
• EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
• EP Humber Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
Combined Cycle Gas Turbine (CCGT) EP UK Power Development II Ltd Existing Generating CMU South Humber Bank DN41
Active • 2024-25 (T-4), 2023-24 (T-4) ...
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (10 components)

EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station. (3)

Combined Cycle Gas Turbine (CCGT) EP UK Power Development II Ltd Existing Generating CMU South Humber Bank DN41
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Kingsnorth, Hoo. St Werburgh, Rochester, Kent, ME3 9TX (10 components)

Combined Cycle Gas Turbine plant (2)

Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Damhead Creek ME3
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (10 components)
• Combined Cycle Gas Turbine plant
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED New Build Generating CMU Damhead Creek Damhead Creek +4 more ME3
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP18DC) (1 component)

New build Combined Cycle Gas Turbine plant

Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED New Build Generating CMU Damhead Creek 2 CCGT Conditional ME3
Inactive • 2022-23 (T-4)
Land adjacent to Brynfyrd Botley Road Romsey SO52 9DP (4 components)
• 10 x 2MW gas powered generator units to be installed on designated land within a manufacturing compound at the Botley Farm.
• Gas fuelled generation plant
Open Cycle Gas Turbine (OCGT) BOTLEY ENERGY LIMITED New Build Generating CMU BOT111 SO52
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land adjacent to Brynfyrd, Botley Road, Romsey, SO52 9DP (4 components)

10 x 2MW gas powered generator units to be installed on designated land within a manufacturing compound at the Botley Farm.

Open Cycle Gas Turbine (OCGT) BOTLEY ENERGY LIMITED New Build Generating CMU BOT111 SO52
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
LAND AT FENTON LANE LITTLE FENTON SHERBURN IN ELMET LS25 6HA (3 components)

NEW BUILD GAS GENERATION STATION

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
land at Hoon Hay Farm Marston Lane Hatton Derby DE65 5EA (1 component)

Gas fuelled generation plant

Open Cycle Gas Turbine (OCGT) HATTON FARM ENERGY LIMITED New Build Generating CMU Conditional DE65
Inactive • 2022-23 (T-4)
Land off Bicester Road Bicester Oxfordshire OX26 6EP (1 component)

Gas fuelled generation plant

Open Cycle Gas Turbine (OCGT) SOLARDEV 3 LTD New Build Generating CMU Conditional OX26
Inactive • 2022-23 (T-4)