Open Cycle Gas Turbine (OCGT)

7 unique locations (106 components)

Trumfleet Generation Site, Marsh Lane, Trumfleet, Doncaster. DN6 0DU (23 components)
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (9 components)
• 4 gas reciprocating engines used for power generation, with associated infrastructure.
• A 49.5MW battery energy storage system
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.04 MW
Land at Crown Farm, King John Bank, Walpole St. Andrew, Wisbech, Norfolk, PE13 5PR (16 components)
• Gas fuelled generation plant
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1 and then cloned to TS18_1
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (19 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• West Burton B Power Station CMU 2 WB2-20= 100% T_WBURB-2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1246.05 MW
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (26 components)
• 1 x hydro turbine & synchronous generator
• 4MW battery co-located with a solar farm
• Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
650.00 MW
BAYSTON HILL QUARRY, BAYSTON HILL, SHREWSBURY, SHROPSHIRE, SY3 0AW (6 components)
• A reciprocating gas engine CHP providing hot water to a local heating network
• Gas fuelled generation plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Cleveland TS2 1UB (7 components)
• Existing OCGT
• New build power station comprised of multiple reciprocating engines.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
83.72 MW
Loading map...