Abergelli Power Station, Felindre, Swansea, SA5 7NN (5 components)
• A new Open Cycle Gas Turbine (OCGT) peaking power plant (2)
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
1422.73 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (74 components)
• Aberthaw 7 OCGT fuel type distillate
• Aberthaw 8 Coal fired
• Aberthaw 8 OCGT fuel is distillate
Active • 2024-25 (T-4), 2023-24 (T-4) ...
17889.58 MW
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA. (17 components)

Small gas fired OCGT. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
583.23 MW
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (26 components)
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
• Existing CCGT
• Existing CCGT Baglan Unit 1
• ... and 2 more unique descriptions
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Brentfield Road Willesden London NW10 8JP (26 components)
• Taylor's Lane OCGT GT Unit 2 This unit is fuelled by Gas Oil as specified by BS 6892 Class A2 Please see letter uploaded to metering section to explain determination of Connection Capacity
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Gas Oil as specified in BS2869 Class A2
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
395.55 MW
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (20 components)

Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (41 components)
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 1 converted to open cycle operation please see letter uploaded in metering section that explains determination of three highest HH periods
• Killingholme Module 1 converted to open cycle operation please see letter uploaded to metering section that describes determination of three highest HH, together with Grid Connection Agreement
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1775.69 MW
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (11 components)
• One (1) Open Cycle Gas Turbine
• One (1) Open Cycle Gas Turbine MSID: 7382
• One (1) Open Cycle Gas Turbine MSID: 7382
Active • 2028-29 (T-4), 2025-26 (T-1) ...
123.42 MW
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (33 components)
• Cowes 1 - OCGT, fuel is distillate
• Cowes 1 - OCGT, fuel is distillate MSID: 4548
• Cowes 1 - OCGT, fuel is gas-oil
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
396.23 MW
Didcot OCGT Power Station Didcot Oxfordshire OX11 7HA (60 components)
• Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate
• Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
• Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is gasoil
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
283.02 MW
Drax Power Station, Drax, Selby, YO8 8PH (25 components)
• Generating Unit 4 at the Drax Power Station with BSC ID T_DRAXX-4.
• This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Drax Power Station, Selby, North Yorkshire, YO8 8PH (70 components)
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• This CMU component is a boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5 under the BSC. The metering for this unit is an aggregation of GEN5 and UT5.The net output of the CMU component will be the metered output for T_DRAXX-5 less the auxiliary load.
• This CMU component is a boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC. The metering for this unit is an aggregation of GEN6 and UT6.The net output of the CMU component will be the metered output for T_DRAXX-6 less the auxiliary load.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
268.28 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (105 components)
• West Burton A Power Station CMU 1 WA1-18 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• West Burton A Power Station CMU 1 WA1-19 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• West Burton A Power Station CMU 1 WA1-20 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• ... and 2 more unique descriptions
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (61 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
41184.15 MW
Factory Lane Croydon Surrey CR0 3RL (7 components)

Existing OCGT.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
131.30 MW
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (107 components)
• Aux. load separately metered
• GT5
• GT8
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2024-25 (T-4) ...
44462.31 MW
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (140 components)
• Generating Unit 1
• Generating Unit 1 for Delivery Year 2017/18 only
• Generating Unit 2
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2024-25 (T-4) ...
50458.36 MW
Fort Parkway Heartlands Birmingham B24 9QT (16 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
267.28 MW
Indian Queens Power Station St. Dennis St. Austell PL26 8BY (12 components)
• Indian Queens Power Station
• Indian Queens Power Station. Extra information: Technology Class and Fuel Type: "OCGT and Reciprocating Engines: Diesel".
Active • 2028-29 (T-4), 2027-28 (T-4) ...
396.23 MW
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (53 components)
• Keadby 1 CCGT
• Keadby GT3
• Single combined cycle gas turbine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
30106.31 MW
land at Hoon Hay Farm, Marston Lane, Hatton, Derbyshire, DE65 5EA (1 component)

gas powered generator to be installed on designated land within a manufacturing compound at the Hoon Hay Farm.

Active • 2024-25 (T-4)
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (7 components)
• Battery Storage plant
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2026-27 (T-4) ...
857.81 MW