Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

72 unique locations (1507 components) - Page 1 of 3

Abergelli Power Station, Felindre, Swansea, SA5 7NN (5 components)
• A new Open Cycle Gas Turbine (OCGT) peaking power plant (2)
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
1422.73 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (74 components)
• Aberthaw 7 OCGT fuel type distillate
• Aberthaw 8 Coal fired
• Aberthaw 8 OCGT fuel is distillate
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1485.98 MW
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA. (17 components)

Small gas fired OCGT. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
583.23 MW
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (26 components)
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
• Existing CCGT
• Existing CCGT Baglan Unit 1
• ... and 2 more unique descriptions
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Barking Power Station, Chequers Lane, Dagenham, Essex RM9 6PF (34 components)
• Three gas turbines operating in open cycle mode. Not a Storage Facility.
• Two gas turbines operating in open cycle mode. Not a Storage Facility
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
350.31 MW
Brentfield Road Willesden London NW10 8JP (26 components)
• Taylor's Lane OCGT GT Unit 2 This unit is fuelled by Gas Oil as specified by BS 6892 Class A2 Please see letter uploaded to metering section to explain determination of Connection Capacity
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Gas Oil as specified in BS2869 Class A2
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
395.55 MW
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT. (16 components)

Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (20 components)

Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (41 components)
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 1 converted to open cycle operation please see letter uploaded in metering section that explains determination of three highest HH periods
• Killingholme Module 1 converted to open cycle operation please see letter uploaded to metering section that describes determination of three highest HH, together with Grid Connection Agreement
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
599.91 MW
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (2 components)

One (1) Open Cycle Gas Turbine MSID: 7382

Inactive • 2023-24 (T-1), 2022-23 (T-1)
42.25 MW
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (11 components)
• One (1) Open Cycle Gas Turbine
• One (1) Open Cycle Gas Turbine MSID: 7382
• One (1) Open Cycle Gas Turbine MSID: 7382
Active • 2028-29 (T-4), 2025-26 (T-1) ...
123.42 MW
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (33 components)
• Cowes 1 - OCGT, fuel is distillate
• Cowes 1 - OCGT, fuel is distillate MSID: 4548
• Cowes 1 - OCGT, fuel is gas-oil
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
210.67 MW
Didcot OCGT Power Station Didcot Oxfordshire OX11 7HA (60 components)
• Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate
• Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
• Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is gasoil
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
95.18 MW
Drax Power Station, Drax, Selby, YO8 8PH (25 components)
• Generating Unit 4 at the Drax Power Station with BSC ID T_DRAXX-4.
• This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Drax Power Station, Selby, North Yorkshire, YO8 8PH (70 components)
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• This CMU component is a boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5 under the BSC. The metering for this unit is an aggregation of GEN5 and UT5.The net output of the CMU component will be the metered output for T_DRAXX-5 less the auxiliary load.
• This CMU component is a boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC. The metering for this unit is an aggregation of GEN6 and UT6.The net output of the CMU component will be the metered output for T_DRAXX-6 less the auxiliary load.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
910.14 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (105 components)
• West Burton A Power Station CMU 1 WA1-18 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• West Burton A Power Station CMU 1 WA1-19 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• West Burton A Power Station CMU 1 WA1-20 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• ... and 2 more unique descriptions
Active • 2026-27 (T-4), 2025-26 (T-4) ...
1256.69 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (61 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1820.10 MW
Factory Lane Croydon Surrey CR0 3RL (7 components)

Existing OCGT.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
131.30 MW
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (107 components)
• Aux. load separately metered
• GT5
• GT8
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2024-25 (T-4) ...
14520.69 MW
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (140 components)
• Generating Unit 1
• Generating Unit 1 for Delivery Year 2017/18 only
• Generating Unit 2
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2024-25 (T-4) ...
10725.94 MW
Fort Parkway Heartlands Birmingham B24 9QT (16 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
267.28 MW
Indian Queens Power Station St. Dennis St. Austell PL26 8BY (12 components)
• Indian Queens Power Station
• Indian Queens Power Station. Extra information: Technology Class and Fuel Type: "OCGT and Reciprocating Engines: Diesel".
Active • 2028-29 (T-4), 2027-28 (T-4) ...
396.23 MW
Loading map...
Showing 25 locations