Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

18 unique locations (500 components)

Whitewall Road, Rochester, Kent, ME2 4DZ (4 components)

A series of gas generators on an existing site.

Active • 2026-27 (T-4), 2024-25 (T-1) ...
38.07 MW
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (13 components)

Gas fuelled CHP generation plant

Active • 2027-28 (T-4), 2025-26 (T-4) ...
15.54 MW
Redditch Generation Station Windsor Road Redditch B97 6HE (7 components)

Gas turbine generator

Active • 2024-25 (T-1), 2023-24 (T-1) ...
23.27 MW
Redditch Generation Station Windsor Road Redditch B97 6HE (3 components)

Gas turbine generator

Active • 2025-26 (T-4), 2023-24 (T-1) ...
23.27 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (92 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U2 OCGT fuelled on Gas Oil as defined by BS2869 Class A2
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1351.06 MW
Newton Aycliffe CO Durham DL5 6EA (17 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.78 MW
Newton Aycliffe CO Durham DL5 6EA (6 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2028-29 (T-4), 2023-24 (T-1) ...
3.19 MW
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (41 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2027-28 (T-4) ...
435.16 MW
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (9 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
128.10 MW
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (53 components)
• Keadby 1 CCGT
• Keadby GT3
• Single combined cycle gas turbine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1264.12 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (105 components)
• West Burton A Power Station CMU 1 WA1-18 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• West Burton A Power Station CMU 1 WA1-19 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• West Burton A Power Station CMU 1 WA1-20 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• ... and 2 more unique descriptions
Active • 2026-27 (T-4), 2025-26 (T-4) ...
1256.69 MW
Drax Power Station, Selby, North Yorkshire, YO8 8PH (70 components)
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• This CMU component is a boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5 under the BSC. The metering for this unit is an aggregation of GEN5 and UT5.The net output of the CMU component will be the metered output for T_DRAXX-5 less the auxiliary load.
• This CMU component is a boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC. The metering for this unit is an aggregation of GEN6 and UT6.The net output of the CMU component will be the metered output for T_DRAXX-6 less the auxiliary load.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
910.14 MW
Drax Power Station, Drax, Selby, YO8 8PH (25 components)
• Generating Unit 4 at the Drax Power Station with BSC ID T_DRAXX-4.
• This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
265.86 MW
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (11 components)
• One (1) Open Cycle Gas Turbine
• One (1) Open Cycle Gas Turbine MSID: 7382
• One (1) Open Cycle Gas Turbine MSID: 7382
Active • 2028-29 (T-4), 2025-26 (T-1) ...
123.42 MW
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (2 components)

One (1) Open Cycle Gas Turbine MSID: 7382

Inactive • 2023-24 (T-1), 2022-23 (T-1)
42.25 MW
Loading map...
Showing 18 locations