Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

2 unique locations (13 components)

New Hall Farm School Lane Birchwood Warrington WA3 6LH (4 components)

New Gas fulled generation station

Active • 2024-25 (T-4), 2023-24 (T-4) ...
5.70 MW
Fort Parkway Heartlands Birmingham B24 9QT (9 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
133.92 MW
Loading map...
Showing 2 locations