Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

35 unique locations (1108 components) - Page 1 of 2

Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (43 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (3)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
119.61 MW
153.14 MW
Units 1-4, Hirwaun Industrial Estate, Hirwaun, Aberdare, S Wales, CF44 9UY (5 components)
• A new 299MW Open Cycle Gas Turbine peaking plant
• A new Open Cycle Gas Turbine peaking plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Ty Coch Farm Greenfield Holywell CH87HT (8 components)

Gas fuelled generation plant

Active • 2024-25 (T-4), 2023-24 (T-4) ...
The Yard, Holme Road, Stoney Holme, Burnley, BB12 0BJ (4 components)

3 x 2MW gas reciprocating engines used for power generation, with associated infrastructure

Active • 2024-25 (T-4), 2023-24 (T-4) ...
15.54 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (92 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U2 OCGT fuelled on Gas Oil as defined by BS2869 Class A2
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9818.67 MW
Progress Power Station, Eye Airfield, Diss, Suffolk, IP23 7HE (5 components)
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Power Station Road Isle of Grain Rochester ME3 0AR (70 components)
• Grain B CCGT Unit 6 CHP element is via supply of heat to Grain LNG regasification facility
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 7 CHP element is via supply of heat to Grain LNG regasification facility
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15432.47 MW
Newton Aycliffe CO Durham DL5 6EA (17 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.78 MW
New Hall Farm School Lane Birchwood Warrington WA3 6LH (3 components)

New Gas fulled generation station

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Millbrook Power Station, Rookery South Pit, Green Lane, Stewartby, Bedfordshire MK43 9LX (4 components)
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Lynchford Lane, Farnborough, GU14 6LW (4 components)

10 gas reciprocating engines used for power generation, with associated infrastructure.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Little Barford Power Station Little Barford St Neots PE19 6YT (28 components)
• Little Barford 1 CCGT
• Little Barford 1 CCGT MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2060.91 MW
Land off Well Street, Paisley, PA1 2QH (4 components)

4 gas reciprocating engines used for power generation, with associated infrastructure.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land adjacent to Brynfyrd Botley Road Romsey SO52 9DP (3 components)

Gas fuelled generation plant

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (53 components)
• Keadby 1 CCGT
• Keadby GT3
• Single combined cycle gas turbine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
30106.31 MW
Indian Queens Power Station St. Dennis St. Austell PL26 8BY (12 components)
• Indian Queens Power Station
• Indian Queens Power Station. Extra information: Technology Class and Fuel Type: "OCGT and Reciprocating Engines: Diesel".
Active • 2028-29 (T-4), 2027-28 (T-4) ...
396.23 MW
Fort Parkway Heartlands Birmingham B24 9QT (16 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
267.28 MW
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (140 components)
• Generating Unit 1
• Generating Unit 1 for Delivery Year 2017/18 only
• Generating Unit 2
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2024-25 (T-4) ...
50458.36 MW
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (107 components)
• Aux. load separately metered
• GT5
• GT8
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2024-25 (T-4) ...
44462.31 MW
Factory Lane Croydon Surrey CR0 3RL (7 components)

Existing OCGT.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
131.30 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (105 components)
• West Burton A Power Station CMU 1 WA1-18 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• West Burton A Power Station CMU 1 WA1-19 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• West Burton A Power Station CMU 1 WA1-20 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• ... and 2 more unique descriptions
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Drax Power Station, Drax, Selby, YO8 8PH (25 components)
• Generating Unit 4 at the Drax Power Station with BSC ID T_DRAXX-4.
• This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 25 locations