Open Cycle Gas Turbine (OCGT)

8 unique locations (98 components)

BAYSTON HILL QUARRY, BAYSTON HILL, SHREWSBURY, SHROPSHIRE, SY3 0AW (6 components)
• A reciprocating gas engine CHP providing hot water to a local heating network
• Gas fuelled generation plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT. (17 components)

Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
156.77 MW
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (26 components)
• 1 x hydro turbine & synchronous generator
• 4MW battery co-located with a solar farm
• Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
650.00 MW
Land at Crown Farm, King John Bank, Walpole St. Andrew, Wisbech, Norfolk, PE13 5PR (16 components)
• Gas fuelled generation plant
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1 and then cloned to TS18_1
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
LAND AT FENTON LANE LITTLE FENTON SHERBURN IN ELMET LS25 6HA (5 components)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• NEW BUILD GAS GENERATION STATION
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
New Hall Farm School Lane Birchwood Warrington WA3 6LH (3 components)
• Load reduction on site supported by non-exporting standby generation.
• New Gas fulled generation station
Active • 2024-25 (T-4), 2022-23 (T-3) ...
5.70 MW
Plot 6 Barrow Man Road, Birchington CT7 0AX (19 components)
• CHP engine in a horticultural environment, natural gas, no aux load
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
14.72 MW
Loading map...
Showing 8 locations