Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Onshore Wind

7 unique locations (396 components)

ROWE CLOSE RUGBY WARWICKSHIRE CV21 (2 components)

15-turbine wind farm

Active • 2025-26 (T-1)
4.72 MW
RH13 (163 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
136.86 MW
PAINTWORKS ARNOS VALE BRISTOL BS4 (2 components)
• 15-turbine wind farm
• Domestic EV charger
Active • 2025-26 (T-1)
4.73 MW
OX16 (76 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
87.70 MW
IP2 (13 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
70.46 MW
B77 (137 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
184.01 MW
Loading map...
Showing 7 locations