Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

126 unique locations (2455 components) - Page 3 of 6

Hythe Power Station Charleston Road Hardley Hythe Southampton SO45 3BP (7 components)
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines . MSID: 7174
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174
Active • 2022-23 (T-3), 2022-23 (T-4) ...
136.00 MW
Indian Queens Power Station St. Dennis St. Austell PL26 8BY (17 components)
• Indian Queens Power Station
• Indian Queens Power Station. Extra information: Technology Class and Fuel Type: "OCGT and Reciprocating Engines: Diesel".
Inactive •
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (65 components)
• Keadby 1 CCGT
• Keadby GT3
• Single combined cycle gas turbine
Active • 2024-25 (T-4), 2025-26 (T-4) ...
6623.53 MW
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (77 components)
• Connah's Quay PS Unit 1 CCGT
• Connah's Quay PS Unit 3 CCGT
• Connah's Quay PS Unit 4 CCGT
Active • 2024-25 (T-4), 2025-26 (T-4) ...
2714.06 MW
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk (13 components)
• New build Combined Cycle Gas Turbine unit G1 at King's Lynn B. (2)
• New build Combined Cycle Gas Turbine unit G2 at King's Lynn B.
Inactive •
Kings Lynn Power Station Willows Business Park Saddlebow, Kings Lynn PE34 3RD (8 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive •
Kingsnorth, Hoo, Rochester, Kent, ME3 9TX (7 components)
• A new Combined Cycle Gas Turbine unit (unit 4) at Damhead Creek 2 power plant
• A new combined cycle gas turbine (unit 5) at Damhead Creek 2 power plant
• Combined Cycle Gas Turbine plant
Active • 2024-25 (T-4), 2025-26 (T-4) ...
5480.84 MW
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (12 components)
• Combined Cycle Gas Turbine plant (2)
• New build Combined Cycle Gas Turbine plant
Inactive •
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP17DC) (4 components)
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
• New reciprocating generating plant.
Inactive •
Knottingley Power Limited Knottingley CCGT Power Station Common Lane Knottingley West Yorkshire WF11 8DA (6 components)
• Knottingley Unit 1 is a combined cycle gas turbine generating unit
• Knottingly Unit 2 is a combined cycle gas turbine generating unit
Inactive •
Land adjacent to Brynfyrd, Botley Road, Romsey, SO52 9DP (4 components)

10 x 2MW gas powered generator units to be installed on designated land within a manufacturing compound at the Botley Farm.

Inactive •
Little Barford Power Station Little Barford St Neots PE19 6YT (29 components)
• Little Barford 1 CCGT MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active • 2022-23 (T-3), 2022-23 (T-4) ...
3881.97 MW
Livesey Branch Rd, Feniscowles, Blackburn, Lancashire, BB2 5HX (14 components)
• Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF
• Small Combined Cycle Gas Turbine plant with registered capacity 75MVA or 60MW at 0.8PF.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
220.53 MW
Loading map...
Showing 25 locations