Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

6 unique locations (55 components)

Victory Road, Derby, Derbyshire, DE24 9HX (6 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Inactive •
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (12 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2023-24 (T-1), 2025-26 (T-4) ...
211.92 MW
Fort Parkway Heartlands Birmingham B24 9QT (9 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Inactive •
Factory Lane Croydon Surrey CR0 3RL (4 components)

Existing OCGT.

Active • 2022-23 (T-3), 2023-24 (T-4) ...
89.51 MW
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Cleveland TS2 1UB (8 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Inactive •
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA. (16 components)
• Small gas fired CCGT.
• Small gas fired OCGT.
Active • 2023-24 (T-1), 2024-25 (T-4) ...
186.17 MW
Loading map...
Showing 6 locations