Open Cycle Gas Turbine (OCGT)

8 unique locations (25 components)

Active MW: 75316.61 MW
Inactive MW: 965.40 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (10 components)
• Aberthaw 7 OCGT fuel type distillate
• Aberthaw 8 Coal fired
• Aberthaw 8 OCGT fuel is distillate
Coal Open Cycle Gas Turbine (OCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_ABTH_7C CMU_ABTH_8C +2 more CF62
Inactive • 2021-22 (T-1), 2017-18 (T-1)
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (3 components)
• Cowes 1 - OCGT, fuel is gas-oil
• Cowes 2 - OCGT, fuel is distillate
• Cowes 2 - OCGT, fuel is gas-oil
Open Cycle Gas Turbine (OCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_COWE1 CMU_COWE2 +1 more PO32
Inactive • 2019-20 (T-1), 2017-18 (T-1)
Kings Lynn Power Station Willows Business Park Saddlebow, Kings Lynn PE34 3RD (2 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station (2)

Combined Cycle Gas Turbine (CCGT) RWE KL Limited New Build Generating CMU Kings Lynn A Kings Lynn A PE34
Inactive • 2019-20 (T-1), 2018-19 (T-1)
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (3 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Combined Cycle Gas Turbine (CCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) RWE GENERATION UK PLC Existing Generating CMU New Build Generating CMU CMU_HYTHE CMU_HYTHE +1 more SO45
Inactive • 2021-22 (T-4), 2020-21 (T-4)
RWE Cogen UK Limited North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT

Combined Cycle Gas Turbine (CCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_SEALS-1 TS2
Inactive • 2021-22 (T-4)
RWE Generation UK plc Ferrybridge A Workshop Site Old Great North Road Knottingley WF11 8PR (1 component)

A CMU will be formed of an Open Cycle Gas Turbine unit.

Open Cycle Gas Turbine (OCGT) RWE GENERATION UK PLC New Build Generating CMU CMU_FERR18 Conditional WF11
Inactive • 2022-23 (T-4)
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083

Combined Cycle Gas Turbine (CCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_SEALS-1 TS2
Inactive • 2020-21 (T-1)
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (4 components)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083 (2)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
OCGT Combined Cycle Gas Turbine (CCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_SEALS-1 CMU_SEALS-1 +1 more TS2
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 8 locations