OCGT

61 unique locations (1288 components) - Page 1 of 3

1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (16 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (33 components)
• New build gas generator
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.64 MW
4 Finway Road Hemel Hempstead HP2 7PT (16 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (19 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
37.74 MW
Abergelli Power Station, Felindre, Swansea, SA5 7NN (5 components)
• A new Open Cycle Gas Turbine (OCGT) peaking power plant
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
284.59 MW
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA. (13 components)
• Small gas fired CCGT.
• Small gas fired OCGT.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
149.89 MW
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Cleveland TS2 1UB (8 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
127.07 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (15 components)
• Gas reciprocating engines
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.04 MW
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (17 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. …
• Gas fired generating units
• Gas reciprocating engines
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.78 MW
Bond Avenue Bletchley Milton Keynes MK1 1JJ (19 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.79 MW
Brentfield Road Willesden London NW10 8JP (24 components)
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590 (2)
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
395.55 MW
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (15 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.87 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (34 components)
• The CMU component is a combined cycle gas turbine
• This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
• This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2492.31 MW
Cavendish Rd Stevenage SG1 2ET UK (17 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.64 MW
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (33 components)
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 1 converted to open cycle operation please see letter uploaded in metering section that explains determination of three …
• Killingholme Module 2 converted to open cycle operation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1775.69 MW
Chesterfield Road, Swallownest, Sheffield, S26 4SX (2 components)
• Gas fired reciprocating engines
• New Build Generating CMU comprising of battery storage and associated plant.
Active • 2026-27 (T-4), 2021-22 (T-4)
2.84 MW
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (27 components)
• Cowes 1 - OCGT, fuel is distillate
• Cowes 1 - OCGT, fuel is distillate MSID: 4548
• Cowes 2 - OCGT, fuel is distillate
Active • 2028-29 (T-4), 2027-28 (T-4) ...
396.23 MW
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (17 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
27.30 MW
Didcot OCGT Power Station Didcot Oxfordshire OX11 7HA (52 components)
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate …
• Didcot 4 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate
Active • 2028-29 (T-4), 2027-28 (T-4) ...
283.02 MW
Dogsthorpe Landfill Site Welland Road Peterborough Cambridgeshire PE1 3TD (8 components)
• 2 gas reciprocating engines with a combined export output of approximately 2MW. The generating equipment is connected to the distribution …
• Gas reciprocating engines
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.44 MW
Drax Power Station, Drax, Selby, YO8 8PH (22 components)
• This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Drax Power Station, Selby, North Yorkshire, YO8 8PH (58 components)
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC
Active • 2028-29 (T-4), 2027-28 (T-4) ...
268.28 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (83 components)
• West Burton A Power Station CMU 3 WA3-19 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) …
• West Burton A Power Station Gas Turbine CMU 1 WG1-18 = 100% T_WBUGT-1
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 25 locations