{# MAP SEARCH SHARED STYLES WHY: Eliminates ~700 lines of duplicate CSS across map search templates Provides consistent styling for split-screen map layout, badges, and mobile interface HOW: Include in the extra_head block in map templates after Bootstrap Icons link TEMPLATES USING THIS: - search_company_map.html - search_technology_map.html - search_cmu_map.html UPDATED: 2025-01-30 #}
Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

8 unique locations (34 components)

Active MW: 75316.61 MW
Inactive MW: 965.40 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (10 components)
• Aberthaw 7 OCGT fuel type distillate
• Aberthaw 8 Coal fired
• Aberthaw 8 OCGT fuel is distillate
Inactive • 2021-22 (T-1), 2017-18 (T-1)
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (4 components)

The CMU component is a combined cycle gas turbine (2)

Inactive • 2018-19 (T-1), 2017-18 (T-1)
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (6 components)
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 1 converted to open cycle operation please see letter uploaded in metering section that explains determination of three highest HH periods
• Killingholme Module 2 converted to open cycle operation
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (3 components)
• Cowes 1 - OCGT, fuel is gas-oil
• Cowes 2 - OCGT, fuel is distillate
• Cowes 2 - OCGT, fuel is gas-oil
Inactive • 2019-20 (T-1), 2017-18 (T-1)
Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ (2 components)

A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near … (2)

Active • 2024-25 (T-1), 2017-18 (T-1)
741.88 MW
Deeside Power Station Weighbridge Road Zone 4, Deeside Industrial Park Deeside Flintshire CH5 2UL (2 components)
• Deeside CCGT Power Station.
• Deeside CCGT Power Station. Please note: The TEC deferral box has been ticked on the CMU Main Page. The text on the EMR Portal screen mentions Rule 3.6.3(b) and the commitment to secure TEC by 18 months before the Delivery Year. DEEP_1 is applying for the Supplementary Auction only and therefore this option has been used in relation to Rule 3.10A.2, where TEC is required by 6 months prior to the Delivery Year.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Keadby Power Station, Trentside, Scunthorpe, North Lincolnshire, DN17 3EF (4 components)
• Keadby 1 CCGT
• Keadby GT3
• Keadby Unit 1
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (3 components)

Existing CCGT (3)

Active • 2025-26 (T-1), 2024-25 (T-1) ...
1551.59 MW
Loading map...
Showing 8 locations