OCGT and Reciprocating Engines

59 unique locations (164 components) - Page 1 of 3

Active MW: 17191.57 MW
Inactive MW: 3505.09 MW
9 J3 Business park, Balby Carr Bank, Doncaster, DN4 8DE (4 components)

A new build gas fuelled generating station.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
75.66 MW
Attune Energy, Ernsettle Lane, Plymouth, PL5 2TS (2 components) Geocoding Needed
• CMU Component is 500kVA reciprocating diesel engine.
• This CMU is a 20MW distrubution connected facility that has been operational since November 2016. It is metered on the distrbution boundary using a COP2 meter and had no auxilliary load on site.
OCGT and Reciprocating Engines ATTUNE ENERGY LIMITED Existing Generating CMU Plymouth A Plymouth A PL5
Inactive • 2018-19 (T-1), 2017-18 (T-1)
38.01 MW
Belvedere Nurseries, Belvedere Lane, Watling Street, Fenny Stratford, Milton Keynes, MK17 9JH (3 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
11.40 MW
Bootle Data Centre, Bridle Road, Bootle, L30 1PH (3 components)
• 11MW of 60 minute frequency response, battery storage
• two 1.4MW caterpillar generators
Storage OCGT and Reciprocating Engines ABBEY HEAT AND POWER CO LIMITED Existing Generating CMU New Build Generating CMU AHAP1 AHAP1 Rejected L30
Inactive • 2021-22 (T-4), 2018-19 (T-1)
4.62 MW
Croespenmaen, Newport, Caerphilly NP11 3BP, Wales (1 component)

The CMU is a new 20MW facility, connected via a COP2 meter at the distribution boundary, with no auxilliary load on site.

Inactive • 2018-19 (T-1)
18.96 MW
Cyclopark, The Tollgate, Watling Street, Istead Rise, Gravesend, DA11 7NP (2 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

OCGT and Reciprocating Engines Suncredit Solutions Limited New Build Generating CMU Not Prequalified DA11
Inactive • 2021-22 (T-4), 2018-19 (T-1)
4.74 MW
Daisymere Lane Buxton Derbyshire SK17 7JW UK (14 components)
• 2.115MW Diesel reciprocating engine
• 2.115MW diesel reciprocating engine
• 2.116MW diesel reciprocating engine
OCGT and Reciprocating Engines Buxton Power Limited New Build Generating CMU BUXTON SK17
Inactive • 2018-19 (T-1), 2017-18 (T-1)
31.08 MW
Daisymere Lane, Buxton Derbyshire SK17 7JW UK (2 components)

2.116MW diesel reciprocating engine

OCGT and Reciprocating Engines Buxton Power Limited New Build Generating CMU BUXTON SK17
Inactive • 2018-19 (T-1), 2017-18 (T-1)
31.08 MW
EDF Land, Cliff Quay, Ipswich Docks, Suffolk (3 components) Geocoding Needed
• A 20 MW CMU, operating on a dockside, metered at the distribution boundary and having no auxilliary load on site.
• Renewable green diesel fuelled generators, connected to the distrbution network at 132KV, metered using a standard half-hour (COP2) meter at the distrbution network boundary with no auxilliary load on site.
OCGT and Reciprocating Engines BALANCE POWER LIMITED New Build Generating CMU Ipswich 2 Ipswich Docks A
Inactive • 2021-22 (T-4), 2018-19 (T-1)
37.92 MW
Former Techboard Site. Rassau Industrial Estate, Rassau, Ebbw Vale NP23 5SD (2 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed, where appropriate, for export. (2)

OCGT and Reciprocating Engines BRECON POWER LTD New Build Generating CMU Brecon Power Brecon Power NP23
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Former Techboard Site., Rassau Industrial Estate, Rassau, Ebbw Vale, NP23 5SD (2 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed, where appropriate, for export.

Inactive • 2018-19 (T-1), 2017-18 (T-1)
39.46 MW
Hills Storage & Distribution Centre Stanley Way Stanley Industrial Estate Skelmersdale WN8 8EA (2 components)
• 20MW gas fuelled generating station
• A new build gas fuelled generating station.
Reciprocating engines OCGT and Reciprocating Engines SWB SKELMERSDALE LTD New Build Generating CMU Biodynamic1 Biodynamic1 WN8
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Hills Storage & Distribution Centre, Stanley Way, Stanley Industrial Estate, Skelmersdale, WN8 8EA (3 components)
• 20MW gas fuelled generating station
• A new build gas fuelled generating station.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
56.82 MW
Holditch House Industrial Estate Holditch Road Newcastle-under-Lyme ST5 9JQ (1 component)

installation of multiple reciprocating generator sets

OCGT and Reciprocating Engines Noriker Staunch Ltd New Build Generating CMU Staunch ST5
Inactive • 2018-19 (T-1)
18.94 MW
Land 15, Carr hill, Balby, Doncaster, DN4 8DG (2 components)
• A 10MW new build gas fuelled generating station.
• A new build gas fuelled generating station.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
18.90 MW
Land adjacent to Haydock Cross Industrial Estate Kilbuck Lane Haydock WA11 9SR (1 component)

Gas engine system capable of exporting electricity.

OCGT and Reciprocating Engines KILBUCK LANE FLEXI LIMITED New Build Generating CMU Kilbuck Lane Gas WA11
Inactive • 2018-19 (T-1)
Land adjacent to Haydock Cross Industrial Estate, Kilbuck Lane, Haydock, WA11 9SR (2 components)

Gas engine system capable of exporting electricity.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
19.91 MW
Land at Burn Park Farm, Cottingham, HU16 5SB (4 components)
• Battery storage plant
• Gas Peaking Reciprocating engines
• Gas peaking reciprocating engine
Reciprocating engines OCGT and Reciprocating Engines NORTON STORAGE LIMITED New Build Generating CMU Creyke Beck Power 002 Creyke Beck Power 025 +2 more HU16
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
189.30 MW
Land at Earnest Nunn Road, Stowmarket, IP14 2AH (1 component)

CMU is a new 20MW facility, metered on the edge of the distrbution boundary using a COP2 meter and with no auxilliary load on site.

OCGT and Reciprocating Engines PRECISE ENERGY LIMITED New Build Generating CMU Stowmarket A IP14
Inactive • 2018-19 (T-1)
18.96 MW