OCGT and Reciprocating Engines
60 unique locations (166 components) - Page 1 of 3
Wytch Farm, Wareham BH20 5JR (4 components) Geocoding Needed
Two gas turbines (CX501-KB7) rated at 5.3MW each.
Wolverhampton Powerhouse, Commercial Road, Wolverhampton WV1 3QS (2 components) Geocoding Needed
Whitwell Energy Park, Southfield Lane, Whitwell, Derbys S803LH (2 components)
Reciprocating engines (2)
WH Davis, Langwith Rd, Shirebrook, Mansfield, Derbyshire NG20 9SA (2 components) Geocoding Needed
WH Davis, Langwith Rd, Shirebrook, Mansfield, Derbyshire NG20 9SA (2 components)
Whaley Rd, Barugh Green, Barnsley S75 1HS, UK (2 components) Geocoding Needed
one 1.2MW caterpillar generator
Waterswallows Road Buxton Derbyshire SK17 7JB (7 components) Geocoding Needed
Unit 2c (N), North Road, Marchwood Industrial Park, Marchwood SO40 4BL (4 components) Geocoding Needed
The Sands Leisure Complex, Burnison Road, Scarborough, YO12 6PH (2 components) Geocoding Needed
Two 1.2MW caterpillar generators
Snape Lane, Doncaster, DN11 8RU (2 components) Geocoding Needed
Rounponds Energy Limited, Roundponds Farm, Melksham, Wiltshire SN12 8DF (4 components) Geocoding Needed
Rounponds Energy Limited Roundponds Farm, Melksham, Wiltshire SN12 8DF (2 components)
Radstone Rd, Radstone, Brackley NN13 5PY (5 components) Geocoding Needed
Prothero Industrial Estate, Bilport Lane, Wednesbury, West Midlands, WS10 0NT (1 component) Geocoding Needed
A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed where appropriate for export.
Prothero Industrial Estate, Bilport Lane, Wednesbury, West Midlands WS10 0NT (1 component)
A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed where appropriate for export.
Plot 15, Sherburn Rail Freight Terminal, New Lennerton Lane, Leeds, LS25 6LH (2 components) Geocoding Needed
CMU is a 20MW facility, metered at the distribution network boundary using a COP2 meter, with no auxilliary load on site
Plot 15, Sherburn Rail Freight Terminal New Lennerton Lane Leeds LS25 6LH (1 component)
CMU is a 20MW facility, metered at the distribution network boundary using a COP2 meter, with no auxilliary load on site
Plant Yard, Howard Yard, Redditch, B98 7SG (20 components) Geocoding Needed
Part Of Plots 15 And 16 Unit Rw 1 Bankwood Lane New Rossington Doncaster DN11 0PS (4 components) Geocoding Needed
Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
O?Brien Skip Hire, Old Droppingwell Road, Sheffield, S61 2DJ (2 components) Geocoding Needed
Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
Nottinghamshire Recycling Centre, Shireoaks Road, Worksop S80 3HA (2 components) Geocoding Needed
Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
Monks Lane, Corsham, Wiltshire, SN13 9PH (1 component) Geocoding Needed
Diesel or gas generating station.
Monks Lane, Corsham, Wiltshire SN13 9PH (1 component) Geocoding Needed
Diesel and/or gas dual fuel generating station.
Monks Lane Corsham Wiltshire SN13 9PH (1 component)
Diesel or gas generating station.
Lodge Lane, Haydock WA12 0HH (4 components) Geocoding Needed
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.