OCGT and Reciprocating Engines (Fuel Type - Gas)

353 unique locations (2240 components) - Page 1 of 15

1020 CENTRE PARK, WARRINGTON WA1 1QY (4 components)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
112 Beddington Lane, Beddington CR0 4TB (8 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (22 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.23 MW
2236 London Road, Glasgow, G32 8YF (5 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
2 Parsonage Lane, Rochester, Kent, ME2 4UR (2 components)

New Gas-fired 20MW CMU connected on the distrbution network boundary via a standard COP2 meter with no auxilliary load on site

Inactive • 2021-22 (T-4)
33 Oxford Road Yeovil BA21 5HR (10 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New build battery
Inactive • 2021-22 (T-4), 2020-21 (T-4)
4 Finway Road Hemel Hempstead HP2 7PT (21 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.23 MW
501 Merlin Park, Burscough Industrial Estate, Ormskirk, L40 8JY (8 components)
• Gas and/or diesel reciprocating engines.
• New build power station comprised of multiple reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
525 Brenda Rd, Hartlepool TS25 1HT (7 components)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
58 Appley Lane N, Appley Bridge, Wigan WN6 9AQ. (2 components)

A new build 5MW gas fuelled generating station.

Inactive • 2021-22 (T-4)
88 Coventry Road Broughton Astley Leicester LE9 6QA (11 components)
• Gas and/or diesel reciprocating engines.
• New build power station comprised of multiple reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
975 Mollison Avenue EN3 7NN (3 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
9A Parker Avenue Felixstowe IP11 4AD (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2021-22 (T-4)
A1085, Middlesbrough TS6 7HJ (8 components)
• Gas and/or diesel reciprocating engines.
• New build power station comprised of multiple reciprocating engines.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
A1(M), Letchworth Garden City, SG6 2ER (3 components)

New 20MW gas-fired facility, metered on the distrbution network boundary using a COP2 meter with no auxilliary load on site

Inactive • 2018-19 (T-1)
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (19 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.90 MW
Ainsworth Lane, Knowsley, Prescot, Mereyside, L34 9EU (11 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Alders Way, Paignton, TQ4 7QL (3 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
Alkane Haydock Energy Park Unit 2 Old Boston Trading Estate Wilcock Road Haydock WA11 9SJ (8 components)
• 4x 2MW Containerised Generating Sets
• Gas fired generating engines
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Allington Lane West End Southampton SO30 3HQ (6 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2018-19 (T-1), 2017-18 (T-1)
AMG Super Alloys, Fullerton Road, Rotherham, South Yorkshire, S60 1DL (8 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Anchor Lane Abbess Roding Ongar CM5 0JR (16 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (14 components)
• Gas reciprocating engines
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
9.84 MW