OCGT and Reciprocating Engines (Fuel Type - Gas)

27 unique locations (539 components) - Page 1 of 2

Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (19 components)
β€’ A gas engine CHP site providing hot water to a local district heating network
β€’ Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
β€’ One CHP engine in a horticultural environment with no auxilliary load.
Active β€’ 2027-28 (T-4), 2025-26 (T-4) ...
8.14 MW
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (27 components)
β€’ Generating Unit 1
β€’ ROCable hydro units within the BMU are not included in the CMU.
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
49.17 MW
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (18 components)
β€’ Aggregate CMU from multiple sources
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
β€’ The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active β€’ 2026-27 (T-4), 2022-23 (T-4) ...
9.52 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (23 components)
β€’ 49.900MW/49.900MWh battery storage asset, 1 hour duration
β€’ Gas fired CHP unit
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
18.70 MW
Poole Bank Nurseries , Common Lane, Welton, Hull, HU15 1UT (18 components)
β€’ Aggregate CMU from multiple sources
β€’ BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active β€’ 2027-28 (T-4), 2024-25 (T-4) ...
287.90 MW
MytheΒ Road. Tewkesbury. Gloucester. GL20 6AA (18 components)
β€’ Load reduction on site supported by non-exporting standby generation.
β€’ The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
β€’ West Burton A Power Station Combined CMU WAC-21 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-3 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
7.15 MW
London School of Hygiene & Tropical Medicine Keppel St, Bloomsbury, London WC1E 7HT (6 components)
β€’ 20 x 1mw gas generator units to be installed on designated land at Kitching Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
β€’ Killingholme Module 2 converted to open cycle operation please see letter uploaded to metering section that explains determination of three highest HH
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
Lodge Lane, Haydock WA12 0HH (10 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive β€’ 2021-22 (T-4), 2018-19 (T-1)
LAND ON THE NORTH SIDE OF GALLEY HILL ROAD NORTHFLEET GRAVESEND DA11 9SW (9 components)
β€’ CMU consisting of multiple reciprocating engines and alternators
β€’ Existing OCGT
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive β€’ 2023-24 (T-4), 2023-24 (T-1) ...
9.63 MW
Land off Glencryan Road, on Carbrain Industrial Estate, Cumbernauld, G67 2UH (4 components)
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
β€’ The facility consists of a lithium ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN's network at 33kV.
Inactive β€’ 2021-22 (T-4), 2018-19 (T-1)
LAND AT 54 BUCKLAND ROAD, PEN MILL TRADING ESTATE, YEOVIL, BA21 5HA (2 components)
β€’ 10 gas reciprocating engines used for power generation, with associated infrastructure.
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive β€’ 2022-23 (T-3), 2021-22 (T-4)
land adjacent to the FIFE GRID SERVICES FACILITY 275KV SUBSTATION, adjacent to the A876 at Kincardine, Fife, FK10 4BL. (31 components)
β€’ 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
β€’ Lithium ion battery storage plant
β€’ SolarPV generating station
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
134.94 MW
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (35 components)
β€’ A Battery Energy Storage System.
β€’ Combined Heat and Power Plant Olympic Park London
β€’ Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
14.68 MW
Houghton Main CMU Generation Plant, Park Spring Road, S Grimethorpe, S72 0HN (8 components)
β€’ Gas reciprocating engines
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive β€’ 2023-24 (T-4), 2022-23 (T-3) ...
5.04 MW
Heol Ty Newydd Cross Hands Food Park, Cross Hands, Llanelli, SA14 6RF, United Kingdom (22 components)
β€’ Load Response - Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
β€’ Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
β€’ This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-9G.
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
47.52 MW
Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS (23 components)
β€’ Generating Unit 2
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
28.28 MW
Glyn Rhonwy Pumped Storage Facility, Ffordd Clegir, Caernarfon, Gwynedd LL55 4EL Note: The site is currently brown field with no ability to receive post. As such this address uses the nearest current postcode. (13 components)
β€’ 49.999 MW pumped storage facility in Gwynedd, North Wales.
β€’ A new Build Generating Storage CMU
β€’ The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
284.81 MW
Gate Lodge, Boundary Farm, Styal Road, Wythenshawe, Manchester, M22 5YA (21 components)
β€’ Site with behind the meter diesel generation - offsetting site load and exporting surplus.
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
37.75 MW
Fitzwise Yard Troughbrook Road Hollingwood CHESTERFIELD S43 2JP (3 components)
β€’ 4MW of demand reduction
β€’ CHPs at Queen Elizabeth Hospital
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active β€’ 2025-26 (T-4), 2021-22 (T-4)
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (20 components)
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
13.89 MW
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (17 components)
β€’ New build battery storage.
β€’ The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
31.11 MW
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (6 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive β€’ 2022-23 (T-4), 2022-23 (T-3) ...
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (46 components)
β€’ Hamms Hall - Existing Site CHP
β€’ Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
β€’ existing CHP on site
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
179.28 MW
Barnsley Facilities Services Limited Estates & Facilities Department Gawber Road Barnsley S75 2EP (14 components)
β€’ 1 MW CHP generation
β€’ 30MW/30MWh one hour battery storage asset located near BURWB1 asset
β€’ Siemens SGT200 based CHP
Active β€’ 2026-27 (T-4), 2024-25 (T-4) ...
5.34 MW
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Cleveland TS2 1UB (7 components)
β€’ Existing OCGT
β€’ New build power station comprised of multiple reciprocating engines.
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2023-24 (T-4) ...
83.72 MW
Loading map...
Showing 25 locations