OCGT and Reciprocating Engines (Fuel Type - Gas)

11 unique locations (198 components)

WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (12 components)
• A gas turbine installed at Aberdeen Royal Infirmary
• Existing Generation on existing site - CHP
• N/A
Active • 2027-28 (T-4), 2026-27 (T-4) ...
63.45 MW
Thurscoe Business Park, Barrowfield Rd, Thurscoe, Rotherham S63 0BH (7 components)
• Gas fired generating units
• Gas reciprocating engines
• N/A
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
St Johns Town of Dalry, Castle Douglas, Kirkcudbrightshire, DG7 3UB, Scotland (37 components)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2026-27 (T-4) ...
80.18 MW
Saltend Lane, HULL, HU12 8PP (33 components)
• Load reduction
• Load reduction on site
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
Active • 2028-29 (T-4), 2025-26 (T-4) ...
14.86 MW
Land off Merseyton Road, Ellesmore Port CH65 2HQ (4 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• Unproven DSR Component
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land off Main Road, Weston, CW2 5LD (2 components)
• 20 MWs of multiple reciprocating generator units to be installed on designated land off main Road, Weston.
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Iwmf, Padworth Lane, Paworth Sidings, Lower Padworth, West Berkshire, RG7 4HY (10 components)
• EV charging on residential premises
• Gas reciprocating engines
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Greenfield Road, Westoning, Bedford, MK45 5JD (9 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• 6 x reciprocating engines
• A Battery Energy Storage System.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Fowler Welch - Site 2, W Marsh Rd, Spalding PE11 2HR, UK (22 components)
• Gas turbine generator
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
23.54 MW
Barking Power Station, Chequers Lane, Dagenham, Essex RM9 6PF (33 components)
• 6.000MW of storage located at Westoning
• Gas fired CHP unit
• Three gas turbines operating in open cycle mode. Not a Storage Facility.
Active • 2024-25 (T-4), 2024-25 (T-1) ...
383.96 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.90 MW
Loading map...
Showing 11 locations