OCGT and Reciprocating Engines (Fuel Type - Gas)

8 unique locations (112 components)

Vale Farm, Enmill Lane, Pitt, Winchester, SO22 5QW (3 components)
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
• 20MWs of reciprocating engine generation connecting into an existing 33 kV pole on land at Vale Farm, Enmill Lane, Pitt, Winchester, SO22 5QW
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (36 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
LAND ON THE NORTH SIDE OF GALLEY HILL ROAD NORTHFLEET GRAVESEND DA11 9SW (9 components)
• CMU consisting of multiple reciprocating engines and alternators
• Existing OCGT
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
9.63 MW
Land at Thornton Lane Markfield LE67 9TU (2 components)
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
• 20 MWs of reciprocating generator units to be installed on designated land at Thornton Lane, near Markfield.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land at Polhampton Farm, Overton, Basingstoke, RG25 3ED (2 components)
• 9.5 MWs of reciprocating engine generation connecting into existing 33kV substation
• A gas engine CHP site providing hot water to a local district heating network
Inactive • 2022-23 (T-3), 2021-22 (T-4)
Land at Outclough Farm, Biddulph Road, ST6 8UW (1 component)

20 MWs of reciprocating engine generation connecting into existing 33kV substation

Inactive • 2021-22 (T-4)
Land at Fordbridge Lane, Blackwell, DE55 5JY (2 components)
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (57 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• The CMU component is a combined cycle gas turbine
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3488.59 MW
Loading map...
Showing 8 locations